background image

G 6 4 0   M i c r o   I n v e r t e r  

 

U s e r   M a n u a l  

G 6 4 0   U M   d r a f t

 v1 20180928

 

© 2 0 1 8   D a r f o n   E l e c t r o n i c s   C o r p .  

p .   1 2   /   1 9  

LED Indication 

 

 

 

LED Icon

 

Indication 

LED Color 

Description 

 

Power Source 1 

Green 

Steady ON:

 Device is powered on by power source 1 

 

Power Source 2 

(*

1

)

 

Green 

Steady ON:

 Device is powered on by power source 2 

 

WLAN (WiFi) 

Green 

Steady ON:

 Wireless radio is enabled 

Flash:

 Data packets are transferred 

OFF:

 Wireless radio is disabled 

 

SIM A 

Green 

Steady ON: 

SIM card A is used

 

 

SIM B 

Green 

Steady ON: 

SIM card B is used

 

~

  LAN 1 ~ LAN 4 

Green 

Steady ON:

 Ethernet connection of LAN is established 

Flash:

 Data packets are transferred 

  High 3G Signal 

Green 

Steady ON:

 The signal strength of 3G is strong 

                                                      

1  If both of power source 1 and power source 2 are connected, the device will 

choose power source 1 first. The LED of power source 2 will remain OFF at this 

condition. 

  Low 3G Signal 

Green 

Steady ON:

 The signal strength of 3G is weak 

 

USB 

Green 

Steady ON:

 If USB device is attached 

  Serial Port 

Green 

Steady ON:

 If serial device is attached 

 

 

 

Installing the PLC Box and Data Logger 

 

CAUTION 

Disconnect  the PV circuit from any grid power before installing the PLC box to 

the AC trunk cable or AC junction box. 

Step 1:

 

Connect the Data Logger to the Router. 

There are two ways to connect the data logger. One way is a direct Ethernet 

connection and the other is through a power bridge connection. If the data logger 

can be placed nearby the router, then a direct Ethernet connection will be setup. 

If the data logger cannot be placed near the router, then a power bridge 

connection will be setup. 

Note: To mount the data logger, use the included wall-mount frame. 

Option 1:

 

  Direct Ethernet Connection 

Connect the data logger to the router with the Ethernet cable. If the 

Ethernet cable does not reach the router, either a longer Ethernet 

cable is needed or setup a power bridge connection. 

Option 2:    Power Bridge Connection 

A Power Bridge connection is suggested to be used with the data 

logger cannot be place near the router. The Power Bridge comes in 

a set of two. Plug in one to the Power Bridges to a nearby AC outlet 

and connect it to the data logger. Plug in the other Power Bridge to 

an AC outlet near the router and connect it to the router. 

 

Step 2:

 

Install the PLC Box. 

Connect DC power to the PLC Box through 12V/1A AC adaptor. Connect the 

AC wiring (PLC Signal) from the PLC Box to the AC Trunk Cable or the AC 

Содержание G640

Страница 1: ...G640 MI CRO I NVERTER U S E R M A N U A L...

Страница 2: ...OTECTION 7 INSTALLING THE MICRO INVERTER 8 INSTALLING ONTO A PV RACKING SYSTEM 8 POST INSTALLATION 10 COMMISSIONING AND OPERATING 10 GFDI FAULT 10 DISCONNECTING A MICRO INVERTER 10 MONITORING SYSTEM 1...

Страница 3: ...operation To reduce risk of burns use caution when working with micro inverters Do not disconnect the DC power source from the micro inverter without first disconnecting the AC power source Both AC an...

Страница 4: ...ogue pdf Citel MSB10 400 http www citel fr userfiles medias Datasheet fiche_anglaise MSB10 UL__A _F141103A pdf FCC Compliance This equipment has been tested and found to comply with the limits for a C...

Страница 5: ...e is recommended such as Belden 3105A however any twisted pair cable can be used such as CAT5 with some degradation of signal and distance Parts and Tools This section provides a list of equipment and...

Страница 6: ...o each G640 by completely isolating the internal DC circuit from the AC circuit and ground DC ground faults are detected on either the positive and or negative conductors of the DC circuit by a Ground...

Страница 7: ...ial number sticker on the DC side can be peeled off the micro inverter and adhered to the installation map template where the actual position on the roof would correspond to the same panel on the layo...

Страница 8: ...tion Align the connector to the position where the micro inverter will be installed Then secure the cable on either side of the rack using cable clips or tie wraps Note the G640 is the micro inverter...

Страница 9: ...as four parts the sealing nut clamp ring seal and cap Slide the sealing nut clamp ring and then the seal onto the AC trunk cable 7 3 Insert the individual wires into the slots inside the cap of the en...

Страница 10: ...allic enclosures metallic raceways metallic equipment or earth When a Ground fault occurs the GFDI will trigger the LED light to show continuous Red and the micro inverter will automatically disconnec...

Страница 11: ...the termination resistor switch on both the Data Logger and PLC Box should be switched ON If the distance between the Data Logger and PLC Box is less than 50m then the termination resistor switch on b...

Страница 12: ...connect the PV circuit from any grid power before installing the PLC box to the AC trunk cable or AC junction box Step 1 Connect the Data Logger to the Router There are two ways to connect the data lo...

Страница 13: ...he micro inverter Note To mount the data logger use the included wall mount frame Step 4 Connect the Data Logger to the PLC Box Insert the red black wiring into the RS485 connectors and then insert th...

Страница 14: ...Step1 Verify that any upstream AC disconnects as well as the dedicated circuit breakers for each AC circuit are functioning properly and are closed Step2 Verify that the AC voltages at the electrical...

Страница 15: ...rrectly use the steps below to troubleshoot the problem If the issue cannot be resolved using these steps please contact inverter maker s technical services Power LED did not turn on Verify that the P...

Страница 16: ...or local regulation PLC Box COMMUNICATION Serial Port Interface 1 x RS485 For Data Logger 1 Maximum Number of Devices Up to 24 Micro Inverters Maximum Transmission Distance2 Up to 164ft 50m MEMORY Int...

Страница 17: ...G 6 4 0 M i c r o I n v e r t e r U s e r M a n u a l G 6 4 0 U M d r a f t v1 20180928 2 0 1 8 D a r f o n E l e c t r o n i c s C o r p p 1 7 1 9 SAMPLE WIRING 240V 1...

Страница 18: ...C o r p p 1 8 1 9 INSTALLATION MAP TEMPLATE Use this map to draw the array and keep track of the micro inverters placement by serial number Peel off and use secondary serial number label on the micro...

Страница 19: ...d by Darfon Electronics Corp 167 Shan ying Road Gueishan Taoyuan 333 Taiwan R O C Tel 886 3 2508800 USA Office Darfon America Corp 103A Pioneer Way Mountain View CA 94041 Tel 1 650 316 6300 For more i...

Отзывы: