e
3
0
b
g
0
3
8
.1
0
IL
IL*110%
1 min
9 min
I
t
IL*110%
Illustration 45: Low Overload
The
high overload
means that if 150% of the continuous current (I
H
) is required for 1 minute every 10 minutes, the remaining 9
minutes must be approximately 92% of I
H
or less. This is to make sure that the output current is not more than I
H
during the duty cycle.
e
3
0
b
g
0
3
9
.1
0
IH
IH*150%
1 min
9 min
IH*150%
I
t
Illustration 46: High Overload
For more information, refer to the standard IEC61800-2.
Specifications
Operating Guide | VACON® NX Inverters FI4-FI8
AQ299433367205en-000101 / DPD00908| 119
Danfoss A/S © 2019.07
Содержание VACON NX FI6
Страница 1: ...Operating Guide VACON NX Inverters FI4 FI8...
Страница 2: ......
Страница 164: ...Operating Guide VACON NX Inverters FI4 FI8 AQ299433367205en 000101 DPD00908 164 Danfoss A S 2019 07...
Страница 165: ...Operating Guide VACON NX Inverters FI4 FI8 AQ299433367205en 000101 DPD00908 165 Danfoss A S 2019 07...