Installation checklist (continued)
Approval
N.A
PASS
FAIL
Low voltage cable shield grounding resistances measured
and valid
☐
☐
☐
Notes:
•
•
•
•
•
•
•
•
•
•
•
•
•
Date:
Signature:
Do not try to tighten bolts or screws that are not discussed in the product manual and that are not
needed for the normal installation procedures. Sealing of the screws may break.
Electric machine weekly maintenance checklist
Date:
Electric machine and customer information
Customer:
Electric machine type (from the rating plate):
Customer reference:
Electric machine serial number:
Service reference:
Date installed:
N.A = Procedure not applicable PASS = Procedure passed FAIL = Procedure failed
Electric machine weekly maintenance checklist
N.A
PASS
FAIL
General construction
Noise or vibration during operation
in general
☐
☐
☐
Cooling system