5
4
Technical certificate
Technical certificate
DETAILED PARTS LIST “FRAME” (4.2 m)
marking
name
quantity(pcs)
length (m)
9 PACKAGE TITAN Arch 196
13-в
Gates cleat
4
1,28
13-в-н
Gates bottom cleat
2
1,28
12-в-п
Gates right stay brace
2
2,61
12-в-л
Gates left stay brace
2
2,60
16-к
Guiding bracket
8
0,08
14-в
Hinged gate diagonal
4
1,73
П-12-в-п
Strip of a right stay brace
2
2,61
П-13-в-н
Strip of a bottom cleat
2
1,28
Hasp
4
0,91
10 PACKAGE TITAN Arch 196
Screw М6х10 DIN 965
460
Bolt М6х14 DIN 933
1192
Bolt М6х20DIN 933
120
Nut М6 DIN 934
1772
Bracket 26х17х16 (angle)
352
Hanger
18
Hinge ПН 1-130 left
4
Hinge ПН 1-130 right
8
Straight lug 40х90
8
Pull РС-80-2
6
Self-driving screw М5х20
352
Washer 6
1344
Washer 32х6
450
Penofol
1
21,4
Door seal
1
35,6
End seal
1
24 м
EXTRA PACKAGE (BASE)
Ridge
2
2,10
Top draw band
3
10,91
Bottom draw band
6
0,60
Ф.ПП.Д
Arc base sheet
4
2,91
Ф.ПП.К
Outermost base sheet for a runner
4
1,95
Tingle
24
0,09
Ф.ПК
Outermost shape
4
2,10
Washer 32х6
24
Bolt М6х14
56
Bolt М6х20
24
Bolt М6х60
6
Nut М6
86
Washer 6
88
Double-size scotch tape
2
5 м
DETAILED PARTS LIST “FRAME” (4.2 m)
marking
name
quantity(pcs)
length (m))
1 PACKAGE TITAN Arch 196
4
Arc
4
3,08
2 PACKAGE TITAN Arch 196
5н
Bottom arc strainer
2
2,73
5
Top arc strainer
2
2,73
6
Segment strainer
3
2,58
7м
Radial strainer 1
4
0,3
7б
Radial strainer 2
3
0,54
3
Support
2
0,29
1
Foundation stay brace
2
0,84
3 PACKAGE TITAN Arch 196
2к
End runner
13
1,99
2кн
Bottom end runner
4
1,99
4 PACKAGE TITAN Arch 196
Укос
Longitudinal stiffness side brace
8
2,36
5 PACKAGE TITAN Arch 196
4
Arс
4
3,08
6 PACKAGE TITAN Arch 196
11
Top girder
2
2,7
15ц
Central vertical member
1
0,6
15
Side vertical member
2
0,55
9
Stay brace
4
2,7
10
Cross bar
5
1,07
8
Side brace
2
1,31
10ц
Central strainer
1
2,72
П-11
Strip of a top girder
1
2,67
П-9
Strip of a gate opening stay brace
2
2,62
П-10
Strip of a cross bar
1
1,01
П-12-д
Strip of a door opening stay brace
1
1,9
7 PACKAGE TITAN Arch 196
5н
Bottom arc strainer
2
2,73
5
Arc strainer
2
2,73
6
Segment strainer
1
2,58
7м
Radial strainer 1
4
0,3
7б
Radial strainer 2
1
0,54
1
Foundation stay brace
6
0,84
3
Support
6
0,29
П-5н
Strip of a bottom arc strainer
6
1,24
Ridge side brace
1
2,23
Strip of a ridge side brace
2
0,03
8 PACKAGE TITAN Arch 196
13-д
Door cleat
2
0,95
13-д-н
Door bottom cleat
1
0,95
12-д-л
Door left stay brace
1
1,88
12-д-п
Door right stay brace
1
1,88
14-д
Door diagonal
2
1,23
П-12-д-п
Strip of a door right stay brace
1
1,88
П-13-д-н
Strip of a door bottom cleat
1
0,95
16к
Guiding bracket
4
0,08
Hasp
2
0,65
Table 4
Table 4