INSTALLATION SEQUENCE
Installation of longitudinal stiffness
side braces.
Installation is carried out in the
same way for variants with or
without the anteroom.
End section assembly with the
anteroom.
Connection the power arc with the
anteroom to the end runners
2к
and
2кн (fig.4.2.)
End section assembly without the
anteroom.
Assembly is carried out according
to the
fig.4.1
. The assembled
power arc (60 kg) is brought to the
end wall with the installed runners,
is raised to the height of the end
runners and joined with their upper
ends. It is recommended to connect
the outermost and middle runners
first.
STAGE 4
fig. 4.1
fig. 4.2
2к
2кн
укос
укос
fig. 4.2
2к
4
STAGE 5
End section installation
In the variant of installation
of the greenhouse without
a foundation, marking
of axes is made on the
ground in accordance
with
fig. 5.1
and holes
70 cm deep are dug for
foundation stay braces
with supports.
In the variant of installation
of the greenhouse
on a
foundation
in accordance
with
fig. 5.1
, cleater
angles are mounted to
the foundation for the
subsequent fastening on
them bottom ends of arcs
in accordance with
fig.
5.2
without foundation
stay braces.
The end section (weight
is about 200 kg) is lifted
and placed in a vertical
position on a prepared
place.
INSTALLATION SEQUENCE
7460
200*
200*
2042
2132
L – axial length of the gr
eenhouse
2132
2042
fig. 5.1
fig. 5.2
200*
84
68
100
200*
200*
45
42
100