background image

11

10

Manual 

Manual 

TITAN Arch 196 GREENHOUSE INSTALLATION MANUAL 

INSTALLATION SEQUENCE

Stage

Name

page.

1

End wall assembly

13-17

2

Installation of runners on the end wall

17

3

Power arc assembly

18-20

4

End section assembly: 

end section without the anteroom assembly;

end section with the anteroom assembly;

installation of longitudinal stiffness side braces on the end 

section.

21

5

End section installation

22

6

Extension of the frame length by the insert

23

7

Second side wall section assembly

23

8

Attaching the second end section to the frame

23

9

Doors and gates assembly

24-26

10

Installation of the cladding and sealing

27-35

E

F

GENERAL VIEW OF THE GREENHOUSE FRAME WITH EXTENDING

     INSERTS

2кн

укос

1

1

3

D

укос

укос

4

4

8

А

B

D

E

C

F

Fig. 1

General view of the greenhouse
with  two  inserts,  total  length  is 
8,4 m.

insert

C

2

2

4

А

B

4

5

9

5

5

11

4

укос

укос

4

4

3. Vocabulary:

Left side

 - on the left, from the position outside the greenhouse, before the gates.

Right side

 - on the right, from the position outside the greenhouse, before the gates.

assembly is carried out using M6 bolts, nuts, washers, self tappers etc. The joints are 

performed by the part overlay and with fastening on holes. Bolts, nuts and washers shall 

5. Assembling the greenhouse is presented in stages, at each stage assembling nodes 

are shown as «before» and «after.» There are no nuts and washers installed from the 

 

6. During assembly, be careful not to damage the parts, because until they assembled 

Use additional tools for assembly:

-wrench 10;

-screwdriver;

-drill with a 

6,5 bit;

-stepladder height of 3m;

-power jigsaw;

-knife.

Содержание TITAN Arch 196

Страница 1: ...17 02 2020 for Greenhouse TITAN Arch 196 Manual...

Страница 2: ...any length 1 2 f o e l p i t l u m min 4 2 m width 7 46 m height 3 8 m...

Страница 3: ...AGE TITAN Arch 196 2800 200 100 41 0 7 PACKAGE TITAN Arch 196 2800 200 100 34 0 8 PACKAGE TITAN Arch 196 500 300 100 14 0 9 PACKAGE TITAN Arch 196 2700 100 90 37 0 10 PACKAGE TITAN Arch 196 500 300 10...

Страница 4: ...TITAN Arch 196 5 Bottom arc strainer 2 2 73 5 Top arc strainer 2 2 73 6 Segment strainer 3 2 58 7 Radial strainer 1 4 0 3 7 Radial strainer 2 3 0 54 3 Support 2 0 29 1 Foundation stay brace 2 0 84 3 P...

Страница 5: ...78 Bolt 6 14 123 Bolt 6 20 50 Nut 6 251 Bracket 26 17 16 97 Hanger 3 Hinge 1 130 left 2 Straight lug 40 90 2 Pull 80 2 2 Self driving screw 97 Washer 6 91 Table 6 DETAILED PARTS LIST INSERT marking na...

Страница 6: ...e as an unheated housing awning warehouse etc it is necessary to control the snowcap to shift the snow down with a wooden or plastic scraper installed on a pole For these variants of operation it is p...

Страница 7: ...EXTENDING INSERTS 2 1 1 3 D 2 4 4 5 8 B D E C F Fig 1 General view of the greenhouse with two inserts total length is 8 4 m insert C 2 2 4 5 B 4 5 5 9 5 5 11 4 2 4 4 3 Vocabulary Left side on the lef...

Страница 8: ...WITH EXTENDING INSERTS ONE INSERT extends the greenhouse by 2 13 m Number of the inserts for the greenhouse is not limited Fig 1 Fig 1 General view with the anteroom ceiling window door wall side piec...

Страница 9: ...arts is carried out in a horizontal plane by connection on side walls of a shape Arcs are connected to each other by nesting at length of the cut with alignment of holes view A bolt 6 14 bolt 6 14 bol...

Страница 10: ...t 6 14 bolt 6 14 bolt 6 14 washer 6 washer 6 washer 6 washer 6 Foundation stay braces 1 supports 3 are connected 1 align the side flanges of shapes fig 1 7 view C R 9 10 9 9 9 1 10 10 10 10 10 10 10 1...

Страница 11: ...ly joined end runners 2 2 align the side flanges of shapes Runners deviate from the vertical under their own weight and abut against side walls of shapes of arcs 4 until the next operation Installatio...

Страница 12: ...washer 6 G 7 6 5 INSTALLATION SEQUENCE General view of the power arc General view of the power arc with the anteroom fig 3 5 fig 3 4 If thegreenhouseisequippedwiththeanteroom install details of the an...

Страница 13: ...st and middle runners first STAGE 4 fig 4 1 fig 4 2 2 2 fig 4 2 2 4 STAGE 5 End section installation Inthevariantofinstallation of the greenhouse without a foundation marking of axes is made on the gr...

Страница 14: ...and middle runners first using a stepladder Next power arc is joined to the power arc that has already been connected and so on all the arcs are alternatively joined It is recommended to connect the o...

Страница 15: ...eet After marking the sheet but prior to cutting it mark the side with the covering layer on each piece of the sheet when the shipping film is removed sheet sides look the same Shipping film shall be...

Страница 16: ...2 5 4 4 6 5 7 3 2100 730 1200 2400 2605 5210 2710 950 2500 12000 1100 wall ceiling window CUTTING LIST FOR THE ANTEROOM CUT POLYCARBONATE SHEET IN STRICT ADHERENCE TO FIG 10 3 Honeycomb polycarbonate...

Страница 17: ...fig 10 5 Fig 10 5 Using a knife adjust covering pieces to arcs 4 and girder 20 and then install sealing profile in accordance with fig 10 6 self tapping screw 4 2 2 Fig 10 4 end covering end covering...

Страница 18: ...from the base package washer 6 from the base package bolt 6 14 washer 6 nut 6 tingle arc base sheet At first install all joint plates and tingles 2940 3 0 0 0 2940 2100 nut 6 ridge shape washer 32 6 b...

Страница 19: ...rill holes in part 1 across the holes in bottom draw band top draw band top draw band bottom draw band nut 6 washer 6 bolt 6 60 washer 6 FASTENING OF COVERING bend the ends of the tingle top draw band...

Страница 20: ...0 germany dancover com Switzerland 0840 000125 schweiz dancover com France 0975 181 800 france dancover com Austria 0662 626935 austria dancover com Sweden 040 233 262 sverige dancover com Finland 0 9...

Отзывы: