11
10
Manual
Manual
TITAN Arch 196 GREENHOUSE INSTALLATION MANUAL
INSTALLATION SEQUENCE
Stage
Name
page.
1
End wall assembly
13-17
2
Installation of runners on the end wall
17
3
Power arc assembly
18-20
4
End section assembly:
end section without the anteroom assembly;
end section with the anteroom assembly;
installation of longitudinal stiffness side braces on the end
section.
21
5
End section installation
22
6
Extension of the frame length by the insert
23
7
Second side wall section assembly
23
8
Attaching the second end section to the frame
23
9
Doors and gates assembly
24-26
10
Installation of the cladding and sealing
27-35
E
F
GENERAL VIEW OF THE GREENHOUSE FRAME WITH EXTENDING
INSERTS
2кн
укос
1
1
3
D
укос
укос
2к
4
4
5н
8
А
B
D
E
C
F
Fig. 1
General view of the greenhouse
with two inserts, total length is
8,4 m.
insert
C
2
2
4
5н
А
B
4
5
5н
9
5
5
11
4
укос
укос
2к
4
4
3. Vocabulary:
Left side
- on the left, from the position outside the greenhouse, before the gates.
Right side
- on the right, from the position outside the greenhouse, before the gates.
assembly is carried out using M6 bolts, nuts, washers, self tappers etc. The joints are
performed by the part overlay and with fastening on holes. Bolts, nuts and washers shall
5. Assembling the greenhouse is presented in stages, at each stage assembling nodes
are shown as «before» and «after.» There are no nuts and washers installed from the
6. During assembly, be careful not to damage the parts, because until they assembled
Use additional tools for assembly:
-wrench 10;
-screwdriver;
-drill with a
6,5 bit;
-stepladder height of 3m;
-power jigsaw;
-knife.