5 Installation
Installation and operation manual
14
RXYSQ6TMYFK
VRV IV-S system air conditioner
4P524881-1 – 2018.02
NOTICE
In Europe, the
greenhouse gas emissions
of the total
refrigerant charge in the system (expressed as tonnes CO
2
equivalent) is used to determine the maintenance intervals.
Follow the applicable legislation.
Formula to calculate the greenhouse gas emissions:
GWP value of the refrigerant × Total refrigerant charge [in
kg] / 1000
2
Fix the label on the inside of the outdoor unit. There is a
dedicated place for it on the wiring diagram label.
5.7
Connecting the electrical wiring
5.7.1
Field wiring: Overview
Field wiring consists of power supply (always including earth) and
indoor-outdoor communication (= transmission) wiring.
Example:
a
d
b
c
b
g
g
c
f
f
f
h
e
e
e
a
h
h
h
h
h
a
Field power supply (with earth leakage protector)
b
Main switch
c
Earth connection
d
Outdoor unit
e
Indoor unit
f
User interface
g
Power supply wiring (sheathed cable) (230 V)
h
Transmission wiring (sheathed cable) (16 V)
Power supply 3N~ 50 Hz
Power supply 1~ 50 Hz
Earth wiring
5.7.2
Guidelines when knocking out knockout
holes
NOTICE
Precautions when making knockout holes:
▪ Avoid damaging the casing.
▪ After making the knockout holes, we recommend you
remove the burrs and paint the edges and areas
around the edges using repair paint to prevent rusting.
▪ When passing electrical wiring through the knockout
holes, wrap the wiring with protective tape to prevent
damage.
b
c
a
a
Knockout hole
b
Burr
c
Sealant etc.
5.7.3
Guidelines when connecting the electrical
wiring
Tightening torques
Wiring
Screw size
Tightening torque
(N•m)
Power supply wiring
(power
shielded ground)
M8
5.5~7.3
Transmission wiring
M3.5
0.8~0.97
5.7.4
To connect the electrical wiring on the
outdoor unit
NOTICE
▪ Follow the wiring diagram (delivered with the unit,
located at the inside of the service cover).
▪ Make sure the electrical wiring does NOT obstruct
proper reattachment of the service cover.
1
Remove the service cover.
2
Connect the transmission wiring as follows:
F1 F2
F1 F2
F1 F2
F1 F2
F1 F2
F1 F2
a
b
X1M (A1P)
F1
Q2
F2
F1
Q1
F2
TO MULTI
UNIT
TO OUT/D
TO IN/D
a
Use the conductor of sheathed wire (2 wire) (no polarity)
b
Terminal board (field supply)
3
Connect the power supply as follows:
3N~ 50 / 60 Hz
380-415 / 400 V
L1 L2 L3
L1 L2 L3
N
X1M
a
b
c
a
Earth leakage circuit breaker
b
Fuse
c
Power supply cable
4
Fix the cables (power supply and transmission wiring) with
cable ties.
Содержание VRV IV-S RXYSQ6TMYFK