15
|
Piping installation
Installer and user reference guide
79
BS4~12A14AJV1B
VRV 5 branch selector unit
4P695527-1 – 2022.02
an extra insulation tube must be installed over the insulation tube coming out of
the unit. Always use tape (field supply) to prevent air gaps in the seam between
the insulation tubes.
e
d
d
a
b
c f
a
Insulation tube (extra thick)(field supply)
b
Tape (field supply)
c
Insulation tube (BS unit)
d
Adherence surface
e
BS unit
f
Insulation tube for levelling out thickness (field supply)
1
Install an insulation tube (a) over the pipe and against the insulation tube (c)
on the BS unit.
2
Attach an extra layer of insulation tube (f) to level out the thickness.
3
Apply tape (b) to close the seam.
Содержание VRV 5 BS4A14AJV1B
Страница 115: ......
Страница 116: ...4P695527 1 2022 02 Copyright 2022 Daikin Verantwortung f r Energie und Umwelt...