14
|
Unit installation
Installer and user reference guide
57
BS4~12A14AJV1B
VRV 5 branch selector unit
4P695527-1 – 2022.02
▪
In places where voltage fluctuates a lot.
▪
Water leakage.
Take care that in the event of a water leak, water CANNOT cause
any damage to the installation space and its surroundings.
▪
Noise.
Choose a location where the operation noise of the unit does not disturb
the room occupants. To avoid that the refrigerant noise disturbs the people in
the room, keep at least 5 m of piping between the occupied room and the BS
unit. If there is no false ceiling in the room, it is advised to add sound insulation
around the piping between the BS unit and the indoor unit, or to keep more
length between the BS unit and the indoor unit.
>5 m
c
a
b
b
a
a
BS unit
b
Indoor unit
c
Sound insulation (field supply)
▪
Drainage.
Make sure condensation water can be evacuated properly.
▪
Drain pipe length.
Keep drain piping as short as possible.
▪
Drain pipe size.
Keep the pipe size equal to or greater than that of the
connecting pipe (vinyl pipe of 20 mm nominal diameter and 26 mm outer
diameter).
▪
Bad odours.
To prevent bad odours and air going into the unit through the drain
piping, install a trap.
a
a
Trap
▪
Ammonia.
Do not connect the drain piping directly to sewage pipes that smell of
ammonia. The ammonia in the sewage pipe might enter the unit through the
drain piping and cause corrosion.
▪
Combining drain pipes.
It is possible to combine drain pipes. Use drain pipes and
T-joints with the correct gauge for the operating capacity of the units.
≥100
a
a
a
T-joint
▪
Spacing.
Respect the following requirements:
Содержание VRV 5 BS4A14AJV1B
Страница 115: ......
Страница 116: ...4P695527 1 2022 02 Copyright 2022 Daikin Verantwortung f r Energie und Umwelt...