Trial Operation
SiUS12-928_A
217
Trial Operation and Field Settings
1. Trial Operation
Outline
1. Measure the supply voltage and make sure that it falls in the specified range.
2. Trial operation should be carried out in either cooling or heating mode.
3. Carry out the test operation in accordance with the Operation Manual to ensure that all functions
and parts, such as louver movement, are working properly.
The air conditioner requires a small amount of power in its standby mode. If the system is not to
be used for some time after installation, shut off the circuit breaker to eliminate unnecessary
power consumption.
If the circuit breaker trips to shut off the power to the air conditioner, the system backs up the
operation mode. The system then restarts operation with the previous mode when the circuit
breaker is restored.
In cooling mode, select the lowest programmable temperature; in heating mode, select the highest
programmable temperature.
Trial operation may be disabled in either mode depending on the room temperature.
After trial operation is complete, set the temperature to a normal level.
(26°C to 28°C (78°F to 82°F) in cooling mode, 20°C to 24°C (68°F to 75°F) in heating mode)
For protection, the system does not start for 3 minutes after it is turned off.
Detail
ARC452 Series
(1) Press the ON/OFF button to turn on the system.
(2) Press the both of TEMP buttons and the MODE button at the same time.
(3) Press the MODE button twice.
(
is displayed on the display to indicate that trial operation is selected.)
(4) Press the MODE button and select operation mode.
(5) Trial operation terminates in approximately 30 minutes and switches into normal mode. To quit
a trial operation, press the ON/OFF button.
(R12302)
(2)
(2) (3) (4)
(1) (5)
(2)
(3)
Содержание SUPER MULTI NX G Series
Страница 1: ...SiUS12 928_A Applied Models Inverter Multi Heat Pump G Series J Series...
Страница 7: ...SiUS12 928_A Table of Contents vi...
Страница 10: ...SiUS12 928_A 1 List of Functions Part 1 List of Functions 1 Functions 3...
Страница 11: ...SiUS12 928_A List of Functions 2...
Страница 16: ...SiUS12 928_A 7 Specifications Part 2 Specifications 1 Specifications 9 1 1 Indoor Unit 9 1 2 Outdoor Unit 11...
Страница 17: ...SiUS12 928_A Specifications 8...
Страница 23: ...SiUS12 928_A Specifications Specifications 14...
Страница 25: ...SiUS12 928_A Printed Circuit Board Connector Wiring Diagram 16...
Страница 35: ...SiUS12 928_A Printed Circuit Board Connector Wiring Diagram Printed Circuit Board Connector Wiring Diagram 26...
Страница 37: ...SiUS12 928_A Function and Control 28...
Страница 69: ...SiUS12 928_A Control Specification Function and Control 60...
Страница 71: ...SiUS12 928_A Operation Manual 62...
Страница 73: ...SiUS12 928_A Duct Free System Operation Manual 64 2 Duct Free System 2 1 Remote Controller...
Страница 83: ...SiUS12 928_A Duct Free System Operation Manual 74 2 7 HOME LEAVE Operation is no longer displayed on the LCD...
Страница 84: ...Duct Free System SiUS12 928_A 75 Operation Manual...
Страница 85: ...SiUS12 928_A Duct Free System Operation Manual 76 2 8 TIMER Operation...
Страница 86: ...Duct Free System SiUS12 928_A 77 Operation Manual...
Страница 87: ...SiUS12 928_A Duct Free System Operation Manual 78 2 9 Note for Multi System...
Страница 88: ...Duct Free System SiUS12 928_A 79 Operation Manual...
Страница 97: ...SiUS12 928_A Slim Duct Built In System Operation Manual 88...
Страница 99: ...SiUS12 928_A Service Diagnosis 90...
Страница 169: ...SiUS12 928_A Removal Procedure 160...
Страница 225: ...SiUS12 928_A Trial Operation and Field Settings 216...
Страница 235: ...SiUS12 928_A Appendix 226...
Страница 243: ...SiUS12 928_A Wiring Diagrams Appendix 234...