42
Operation
EN
RoCon UFH
7
Operation
7.1
Overview of the LED signals
Table 7-1: LED signals in the base module
Fig. 7-1: LED positions in the base module
Indication
State
Explanation
A.
Operation mains
voltage
(LED green)
Solid lit
When 230 V AC mains voltage is applied.
Goes off
In the case of power outage.
If the fuse (1) trips.
B.
Operation 5 V
(LED green)
Solid lit
If 5 V supply is applied.
Goes off
In the case of power outage.
If the fuse (1) trips.
If the 5 V supply fails.
C.
Pump Heating
(LED red)
Solid lit
If at least one room temperature controller is
requesting heating energy.
Goes off
If no room temperature controller is requesting
heating energy.
D.
Pump Cooling
(LED blue)
Solid lit
If the controller is set to "Cooling" and if at least
one room temperature controller is requesting
cooling.
Goes off
If no room temperature controller is requesting
cooling.
E.
Cooling
(LED blue)
Solid lit
If the controller is set to "Cooling".
Goes off
If the controller is set to "Heating".
Содержание RoCon UFH
Страница 2: ......
Страница 27: ...25 Mounting EN RoCon UFH 6 Refit the cover and close it Fig 5 5 Closing the cover ...
Страница 64: ......
Страница 89: ...25 Montage DE RoCon UFH 6 Hängen Sie die Abdeckung ein und schließen diese Bild 5 5 Abdeckung schließen ...
Страница 126: ......
Страница 151: ...25 Montage FR RoCon UFH 6 Accrocher le couvercle et le fermer Fig 5 5 Fermer le couvercle ...
Страница 188: ......
Страница 213: ...25 Montage NL RoCon UFH 6 Haak de afdekking vast en sluit haar Afb 5 5 Afdekking sluiten ...
Страница 250: ......
Страница 275: ...25 Installazione IT RoCon UFH 6 Agganciare la copertura e chiuderla Fig 5 5 Chiusura della copertura ...
Страница 312: ...008 1706699 00 12 2020 Copyright Daikin www daikin eu ...