39
Commissioning
EN
RoCon UFH
6.3.3
Clear/reset
4. Proceed as described above.
Once you have taught in all control cir-
cuits (1 to 2, or 1 to 6) of a product, the
product switches back to normal operat-
ing mode.
If you do not press the LRN key of a room
controller in LRN mode (the yellow control
circuit LED flashes at intervals of one
second) for a period of 30 seconds, the
product automatically switches back to
normal operating mode.
Fig. 6-2: Establishing a connection to the controller module (2)
1. Press the CLR key of the product with
the tip of the ballpoint pen (for at least
two seconds) until the yellow LED for
control circuit 1 starts flashing.
- All taught-in room controllers of this
product have been cleared.
- The product is again in teach-in
mode.
Fig. 6-3: Deleting a controller module
Содержание RoCon UFH
Страница 2: ......
Страница 27: ...25 Mounting EN RoCon UFH 6 Refit the cover and close it Fig 5 5 Closing the cover ...
Страница 64: ......
Страница 89: ...25 Montage DE RoCon UFH 6 Hängen Sie die Abdeckung ein und schließen diese Bild 5 5 Abdeckung schließen ...
Страница 126: ......
Страница 151: ...25 Montage FR RoCon UFH 6 Accrocher le couvercle et le fermer Fig 5 5 Fermer le couvercle ...
Страница 188: ......
Страница 213: ...25 Montage NL RoCon UFH 6 Haak de afdekking vast en sluit haar Afb 5 5 Afdekking sluiten ...
Страница 250: ......
Страница 275: ...25 Installazione IT RoCon UFH 6 Agganciare la copertura e chiuderla Fig 5 5 Chiusura della copertura ...
Страница 312: ...008 1706699 00 12 2020 Copyright Daikin www daikin eu ...