ESIE19-06
|
Part 3. Repair
3.2. Unit specific repair procedures
Page 40
21/01/20
|
Version 1.1
Modular L Smart
3.2. Unit specific repair procedures
Overview:
3.2.1. HRV unit
3.2.1.1. Basic removal - removing switchbox cover
PRELIMINARY ACTIONS
1. Switch off the Daikin unit via the user interface.
2. Switch off the Daikin unit with the field supplied circuit breaker.
PROCEDURE
Removal
1. Loosen and remove the screws that fix the switchbox cover.
2. Pull the switchbox cover.
Figure 3-1: Removing the screws
HRV unit .............................................................................................................................................................................................. 40
Basic removal - removing switchbox cover ............................................................................................................................. 40
Removing main PCB ............................................................................................................................................................... 42
Removing Smart Gateway....................................................................................................................................................... 44
Basic removal - removing doors and central panel ................................................................................................................. 45
Removing heat exchanger....................................................................................................................................................... 48
Removing EC fan .................................................................................................................................................................... 49
1. Screw
1
Step 1
Содержание Modular L Smart
Страница 1: ...Service Manual Modular L Smart ESIE19 06 ...
Страница 6: ...ESIE19 06 Page 6 21 01 20 Version 1 1 Modular L Smart ...
Страница 16: ...ESIE19 06 Part 1 Introduction 1 4 How to use Page 16 21 01 20 Version 1 1 Modular L Smart ...
Страница 59: ...ESIE19 06 Part 4 Maintenance 4 1 HRV unit 21 01 20 Version 1 1 Page 59 Modular L Smart ...
Страница 60: ...ESIE19 06 Part 4 Maintenance 4 1 HRV unit Page 60 21 01 20 Version 1 1 Modular L Smart ...
Страница 62: ...ESIE19 06 Part 5 Appendix Page 62 21 01 20 Version 1 1 Modular L Smart This page is deliberately left blank ...
Страница 86: ...ESIE19 06 Part 5 Appendix 5 4 Switch box Modular L Smart Page 86 21 01 20 Version 1 1 Figure 5 23 Control PCB ...