![Daikin FHA100AVEB8 Скачать руководство пользователя страница 64](http://html.mh-extra.com/html/daikin/fha100aveb8/fha100aveb8_user-reference-manual_2460428064.webp)
17
|
Piping installation
Installer and user reference guide
64
FHA-A(9)
Split system air conditioner
4P708119-1 – 2022.11
a
b
a
Rear refrigerant piping
b
Rear piping pipe port cover
2
Run the field supply pipes through the cut out holes.
3
After the drain and refrigerant piping is finished, install the pipe port cover
back. Run all the cables through the clamp of the pipe port cover and fix.
a b c
a
Clamp of the pipe port cover
b
Cables
Upward piping
INFORMATION
L-shaped connection piping kit (optional accessory) is required.
1
Remove the top pipe port cover and cut out the holes for piping. When
cutting out the holes, make sure to avoid the knob part of the cover. Use an L-
shaped connection piping kit (optional accessory) for the piping. Run the pipes
through the cut out holes.
a
b
a
Upward refrigerant piping
b
Top pipe port cover
Right piping
1
Remove the reinforcing plate at the right side and put back the screw in the
original position on the indoor unit.
2
Remove the decoration side panel.
3
Remove the rectangular part of the decoration side panel.
Содержание FHA100AVEB8
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ...4P708119 1 2022 11 Copyright 2022 Daikin Verantwortung für Energie und Umwelt ...