ESIE05-04
Disassembly and Maintenance
Part 5 – Disassembly and Maintenance
5–85
3
5
1
5
1.13.3 Removal of Horizontal Blade
Warning
Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step
Procedure
Points
1
Gently bend the support
plate located at the
center of the horizontal
blade, and detach the
center shaft.
(Two shafts provided
on Types 140 and
160.)
2
Then gently bend the
center of the horizontal
blade, and take both the
end shafts out of their
bearings.
Q
When removing the horizontal
blade from the bearings at
both ends, be careful not to
get the blow port thermal
insulation scratched.
Reassembling precautions
1
The shaft at the right end
of the horizontal blade is
cut in D shape. Fit this
D-shaped end to the
D-profiled bearing.
Reattach the horizontal
blade at the right side
first.
Содержание FCQ35B7V1
Страница 1: ...Service Manual ESIE05 04 R 410A Sky Air Indoor...
Страница 2: ......
Страница 20: ...ESIE05 04 1 2 Part 1 System Outline 3 1 1 5...
Страница 62: ...General Outline ESIE05 04 1 44 Part 1 System Outline 3 1 1 4 5...
Страница 78: ...ESIE05 04 1 60 Part 1 System Outline...
Страница 112: ...Wiring Diagrams ESIE05 04 1 94 Part 1 System Outline 3 1 1 4 5...
Страница 140: ...ESIE05 04 2 2 Part 2 Functional Description 3 1 2 5...
Страница 164: ...ESIE05 04 3 2 Part 3 Troubleshooting 3 1 3 5...
Страница 206: ...Error Codes ESIE05 04 3 44 Part 3 Troubleshooting 3 1 3 4 5...
Страница 224: ...Additional Checks for Troubleshooting ESIE05 04 3 62 Part 3 Troubleshooting 3 1 3 4 5...
Страница 226: ...ESIE05 04 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 252: ...ESIE05 04 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Страница 384: ...Disassembly and Maintenance ESIE05 04 5 134 Part 5 Disassembly and Maintenance 3 1 5 5...
Страница 390: ...ESIE05 04 vi Index 3 1 4 5 W Wiring diagrams Indoor units k 1 61...