Disassembly and Maintenance
ESIE05-04
5–54
Part 5 – Disassembly and Maintenance
3
1
5
5
Step
Procedure
Points
3
Remove five pieces of
lead wires from PCB on
the switch box and lead
wire connected to the
capacitor for fan motor.
(Refer to the list shown in
the right.)
4
Cut tie wraps fixing lead
wires of float switch,
thermistor for heating and
liquid pipe thermistor.
5
Remove two fixing
screws located at both
ends of switch box and
one screw inside the box.
6
Remove the switch box.
∗
Five pieces lead wires shown below (connect to the PCB) and
lead wire connected to the capacitor for fan motor.
X15A······Lead wire of float switch
X17A······Lead wire of thermistor for heating
X18A······Lead wire of liquid pipe thermistor
X20A······Lead wire of fan motor
X25A······Lead wire of drain pump
(S2763)
Содержание FCQ35B7V1
Страница 1: ...Service Manual ESIE05 04 R 410A Sky Air Indoor...
Страница 2: ......
Страница 20: ...ESIE05 04 1 2 Part 1 System Outline 3 1 1 5...
Страница 62: ...General Outline ESIE05 04 1 44 Part 1 System Outline 3 1 1 4 5...
Страница 78: ...ESIE05 04 1 60 Part 1 System Outline...
Страница 112: ...Wiring Diagrams ESIE05 04 1 94 Part 1 System Outline 3 1 1 4 5...
Страница 140: ...ESIE05 04 2 2 Part 2 Functional Description 3 1 2 5...
Страница 164: ...ESIE05 04 3 2 Part 3 Troubleshooting 3 1 3 5...
Страница 206: ...Error Codes ESIE05 04 3 44 Part 3 Troubleshooting 3 1 3 4 5...
Страница 224: ...Additional Checks for Troubleshooting ESIE05 04 3 62 Part 3 Troubleshooting 3 1 3 4 5...
Страница 226: ...ESIE05 04 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 252: ...ESIE05 04 5 2 Part 5 Disassembly and Maintenance 3 1 5...
Страница 384: ...Disassembly and Maintenance ESIE05 04 5 134 Part 5 Disassembly and Maintenance 3 1 5 5...
Страница 390: ...ESIE05 04 vi Index 3 1 4 5 W Wiring diagrams Indoor units k 1 61...