background image

43

VENT/FLUE

TEE

COMBUSTION

AIR INTAKE.

DISTANCE BETWEEN

COMBUSTION AIR

INTAKE AND GRADE

DISTANCE BETWEEN

VENT AND GRADE

For all side wall horizontally vented gas fueled equipment 

installed  in  every  dwelling,  building  or  structure  used  in 

whole  or  in  part  for  residential  purposes,  including  those 

owned or operated by the Commonwealth  and where the 

side wall exhaust vent termination is less than seven (7) feet 

above finished grade in the area of the venting, including but 

not limited to decks and porches, the following requirements 

shall be satisfied:

1.  INSTALLATION OF CARBON MONOXIDE 

DETECTORS. At the time of installation of the side 

wall horizontal vented gas fueled equipment, the 

installing plumber or gasfitter shall observe that a hard 

wired carbon monoxide detector with an alarm and 

battery back-up is installed on the floor level where 

the gas equipment is to be installed. In addition, 

the installing plumber or gasfitter shall observe that 

a battery operated or hard wired carbon monoxide 

detector with an alarm is installed on each additional 

level of the dwelling, building or structure served by 

the side wall horizontal vented gas fueled equipment. 

It shall be the responsibility of the property owner to 

secure the services of qualified licensed professionals 

for the installation of hard wired carbon monoxide 

detectors.

a.    In the event that the side wall horizontally vented 

gas fueled equipment is installed in a crawl space 

or an attic, the hard wired carbon monoxide 

detector with alarm and battery back-up may be 

installed on the next adjacent floor level.

b. 

  In the event that the requirements of this 

subdivision can not be met at the time of 

completion of installation, the owner shall have a 

period of thirty (30) days to comply with the above 

requirements; provided, however, that during 

said thirty (30) day period, a battery operated 

carbon monoxide detector with an alarm shall be 

installed.

2.  APPROVED CARBON MONOXIDE DETECTORS. 

Each carbon monoxide detector as required in 

accordance with the above provisions shall comply 

with NFPA 720 and be ANSI/UL 2034 listed and IAS 

certified.

Special Instructions for Products Installed in the State of Massachusetts

3.  SIGNAGE. A metal or plastic identification plate shall 

be permanently mounted to the exterior of the building 

at a minimum height of eight (8) feet above grade 

directly in line with the exhaust vent terminal for the 

horizontally vented gas fueled heating appliance or 

equipment. The sign shall read, in print size no less 

than one-half (1/2) inch in size, “GAS VENT DIRECTLY 

BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS”.

4.  INSPECTION. The state or local gas inspector of the 

side wall horizontally vented gas fueled equipment 

shall not approve the installation unless, upon 

inspection, the inspector observes carbon monoxide 

detectors and signage installed in accordance with the 

provisions of 248 CMR 5.08(2)(a)1 through 4. 

EXEMPTIONS

The following equipment is exempt from 248 CMR 5.08(2)

(a)1 through 4: 

1. 

The equipment listed in Chapter 10 entitled “Equipment 

Not Required To Be Vented” in the most current edition 

of NFPA 54 as adopted by the Board; and 

2.  Product Approved side wall horizontally vented gas 

fueled equipment installed in a room or structure 

separate from the dwelling, building or structure used 

in whole or in part for residential purposes. 

c.    MANUFACTURER REQUIREMENTS - GAS 

EQUIPMENT VENTING SYSTEM PROVIDED. 

When the manufacturer of Product Approved side 

wall horizontally vented gas equipment provides 

a venting system design or venting system 

components with the equipment, the instructions 

provided by the manufacturer for installation of the 

equipment and the venting system shall include:

3. 

Detailed instructions for the installation of the venting 

system design or the venting system components; and

4. 

A complete parts list for the venting system design or 

venting system. 

d.  MANUFACTURER REQUIREMENTS - GAS 

EQUIPMENT VENTING SYSTEM NOT 

PROVIDED. When the manufacturer of a Product 

Approved side wall horizontally vented gas fueled 

equipment does not provide the parts for venting 

the flue gases, but identifies “special venting 

systems”, the following requirements shall be 

satisfied by the manufacturer:

5. 

The referenced “special venting system” instructions 

shall be included with the appliance or equipment 

installation instructions; and 

6. 

The “special venting systems” shall be Product 

Approved by the Board, and the instructions for 

that system shall include a parts list and detailed 

installation instructions. 

e. 

  A copy of all installation instructions for all Product 

Approved side wall horizontally vented gas fueled 

equipment, all venting instructions, all parts lists 

for venting instructions, and/or all venting design 

instructions shall remain with the appliance or 

equipment at the completion of the installation.

Содержание DM92SS

Страница 1: ...THIS SYMBOL AS A SAFETY PRECAUTION TABLE OF CONTENTS Safety Considerations 3 Shipping Inspection 4 Electrostatic Discharge ESD Precautions 5 To The Installer 5 Product Application 5 Location Requirem...

Страница 2: ...26 High Altitude Derate 26 Propane Gas Conversion 26 Gas Piping Connections 26 Gas Piping Checks 29 Propane Gas Tanks and Piping 29 Circulating Air Filters 29 Duct work Air Flow 29 Checking Duct Stati...

Страница 3: ...gas fired furnace for installation in a residential garage must be installed as specified in the LOCATION REQUIREMENTS AND CONSIDERATIONS section of this manual This furnace may be used as a construc...

Страница 4: ...electrical shock the furnace must be located to protect the electrical components from water Drain trap must be primed at time of installation Trap is internally partitioned add water to both inlet po...

Страница 5: ...ith static electricity i e do not move or shuffle your feet do not touch ungrounded objects etc If you come in contact with an ungrounded object repeat step 2 before touching control or wires 4 Discha...

Страница 6: ...and the service area around the unit must have flooring To ensure proper furnace operation install operate and maintain the furnace in accordance with these installation and operation instructions al...

Страница 7: ...above substances This protects the non direct vent furnace from airborne contaminants To ensure that the enclosed non direct vent furnace has an adequate supply of combustion air vent from a nearby u...

Страница 8: ...nting system may be too large to properly vent the remaining attached appliances POSITION SIDES REAR FRONT BOTTOM FLUE TOP Upflow 0 0 3 C 0 1 Horizontal 6 0 3 C 0 6 C If placed on combustible floor fl...

Страница 9: ...ant l un des essais d crits ci dessus des correctifs doivent tre apport s au syst me de ventilation conform ment au National Fuel Gas Code ANSI Z223 1 NFPA 54 et ou au Code d installation du gaz natur...

Страница 10: ...tal counterflow furnaces return ductwork must be attached to the basepan top end of the blower compartment NOTE Ductwork must never be attached to the back of the furnace Contact your distributor for...

Страница 11: ...gy content difference between natural and propane gas High Stage Low Stage Natural None 45 3 5 w c 1 9 w c None Propane LPM 07 1 1 25mm 10 0 w c 6 0 w c None Gas Altitude Kit Orifice Manifold Pressure...

Страница 12: ...aterials and Joining Methods Two three inch nominal diameter PVC Schedule 40 pipe meeting ASTM D1785 PVC primer meeting ASTM F656 and PVC solvent cement meeting ASTM D2564 specifications must be used...

Страница 13: ...es above ground level or the anticipated snow level Vent terminations non direct and direct vent must terminate at least 3 feet above any forced air inlet located within 10 feet NOTE This provision do...

Страница 14: ...pipe Secure vent flue pipe directly into the furnace fitting with the appropriate glue Alternately a small section of 2 pipe may be glued in the furnace socket and a rubber coupling installed to allow...

Страница 15: ...er outlet 5 Install cut end of the flanged section and connect to inducer with rubber coupling supplied with furnace Install screws removed in step 1 securing flange to cabinet MODEL PIPE SIZE 1 2 3 4...

Страница 16: ...per material manufacturers specifications to prevent separation and flue gas leaks Figure 11 Insert flange Cut 2 long R 000142 F Figure 9 CUT HERE Figure 10 Vent Flue Pipe Cuts Upflow Horizontal model...

Страница 17: ...secured to the combustion air intake to prevent inadvertent blockage The tee used in the vent flue termination must be included when determining the number of elbows in the piping system Vent Flue Pi...

Страница 18: ...r specific details on termination construction For details concerning connection of pipes to the furnace refer to the Vent Flue Pipe and Combustion Pipe Standard Furnace Connections or Alternate Furna...

Страница 19: ...ecifications Condensate Drain Lines Drain Trap Acondensing gas furnace achieves its high level of efficiency by extracting heat from the products of combustion to the point where condensation takes pl...

Страница 20: ...ay be added in the area shown in Figure 21 Any unused cabinet opening must be sealed Do not allow drain hose to sag or trap water Figure 21 Drain Exiting Right Side 1 Locate and Install the 45 pipe ho...

Страница 21: ...the top mounting tabs of the trap into the two predrilled holes in the side of the cabinet 9 Refer to Field Supplied Drain section for instructions on field supplied installed drain on outlet of furn...

Страница 22: ...he non grommet end Discard the section without the grommet 5 Insert the cut end of tube 5 through the lower cabinet drain hole 6 Insert 100 degree elbow in the cut end of hose 5 7 Locate hose 6 Using...

Страница 23: ...ses needed for installation and install per the following directions 1 Remove the drain trap and factory installed drain tube assemblies 2 Remove two 1 plugs from right side of cabinet 3 Draining the...

Страница 24: ...n hole 12 Insert 100 elbow in hose 5 and secure with a red clamp 13 Locate hose 4 and cut a cut off a 4 straight section and discard the radius end 14 Connect the 4 straight section of hose 4 to the 1...

Страница 25: ...low NOTE Wire routing must not to interfere with circulator blower operation filter removal or routine maintenance Junction Box Relocation WARNING HIGH VOLTAGE To avoid personal injury or death due to...

Страница 26: ...t not be exceeded to prevent unit overfiring High Altitude Derate When this furnace is installed at high altitude the appropriate High Altitude orifice kit must be applied This is required due to the...

Страница 27: ...1 8 NPT pipe plug fitting accessible for test gauge connection immediately upstream of the gas supply connection to the furnace Always use a back up wrench when making the connection to the gas valve...

Страница 28: ...ation Gas Valve Burners Manual Shut Off Valve upstream from ground joint pipe union Drip Leg Grommet in Standard Gas Line Hole Ground Joint Pipe Union Ground Joint Pipe Union NOTE Union may be inside...

Страница 29: ...de NSCNGPIC CAN CSA B149 1 15 For satisfactory operation propane gas pressure must be 10 WC at the furnace manifold with all gas appliances in operation Maintaining proper gas pressure depends on thre...

Страница 30: ...an air conditioner coil or Electronic Air Cleaner is used in conjunction with the furnace the readings must also include theses components as shown in the following drawing 4 Consult proper tables for...

Страница 31: ...e furnace The installation of a centrally installed air cleaner cabinet or a return duct filter installation may offer more practicality Clean Comfort brand MERV 11 air cleaners have 5 media filters a...

Страница 32: ...t angle 2000 CFM 20 in X 25 in x 5 AM11 2025 5RA AM11 5RA Bottom return platform 2000 CFM 20 in X 25 in x 5 AM11 2832 5PP Bottom return platform 2000 CFM 20 in X 25 in x 5 AM11 2843 5PP AM11 5 2 X 160...

Страница 33: ...ances on the same gas supply line 4 Measure furnace gas supply pressure with burners firing Supply pressure must be within the range specified in the Inlet Gas Supply Pressure table If supply pressure...

Страница 34: ...pplier if additional input rate adjustment is required 4 Turn ON gas to and relight all other appliances turned off in step 1 Be certain that all appliances are functioning properly and that all pilot...

Страница 35: ...als 4 Connect all unused blower motor leads to the PARK terminals on the integrated control module Any leads not connected to the PARK terminals must be taped 5 Turn ON power to furnace 6 Verify prope...

Страница 36: ...heat exchanger compartment temperatures It is a normally closed electrically automatic reset temperature activated sensor The limit guards against overheating as a result of insufficient conditioned...

Страница 37: ...following a one hour lockout period 2 Manual power interruption Interrupt 115 volt power to the furnace 3 Manual thermostat cycle Lower the thermostat so that there is no longer a call for heat for 1...

Страница 38: ...condensate drainage Check drain system for hose connection tightness blockage and leaks Clean or repair as necessary Flame Sensor Qualified Servicer Only Under some conditions the fuel or air supply c...

Страница 39: ...Loose or improperly connected wiring Pressure switch circuit not closed Induced draft blower isoperating Induced draft blower runs continuously with no further furnace operation Integrated control mo...

Страница 40: ...peration Rollout limit open Integrated control module fuse is blown Check burners for proper alignment Check flue and air inlet piping for blockage proper length elbows and termination Correct as nece...

Страница 41: ...N A 1203 N A 1158 N A 1111 1058 932 HIGH 5 0 2235 38 2166 39 2110 40 2021 42 1956 44 1855 1740 1618 MED 4 0 1955 44 1921 44 1860 46 1808 47 1746 49 1645 1572 1461 MED LO 3 5 1658 51 1634 52 1590 54 15...

Страница 42: ...OX 1 TO115 VAC 1 60HZ OR ID BLOWER PRESSURE SWITCH HEAT H GND WH RD WH GND BURNER COMPARTMENT BLOWER COMPARTMENT N O COOL H BK HI BR BR CAPACITOR YL WH CONTROL PRIMARY LIMIT AUTO RESET BL PU MANUAL RE...

Страница 43: ...nimum height of eight 8 feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less...

Страница 44: ...se DB F Delta T Difference between Supply and Return Temperatures DB F GAS PRESSURES Gas Inlet Pressure IN W C Gas Manifold Pressure Low Fire IN W C Gas Manifold Pressure High Fire IN W C Gas Type NG...

Страница 45: ...45 THIS PAGE IS LEFT INTENTIONALLY BLANK...

Страница 46: ...46 THIS PAGE IS LEFT INTENTIONALLY BLANK...

Страница 47: ...47 THIS PAGE IS LEFT INTENTIONALLY BLANK...

Страница 48: ...e protec on of the standard warranty registering your product is a rela vely short process and en tles you to addi onal warranty protec on except that failure by California and Quebec residents to reg...

Отзывы: