SiBE07-618_C
Table of Contents
iv
1.8
Removal of Compressor.......................................................................122
Part 8 Trial Operation and Field Settings................................. 125
1. Trial Operation ....................................................................................126
2. Field Settings ......................................................................................127
2.1
When 2 Units are Installed in 1 Room..................................................127
2.2
Facility Setting Switch (cooling at low outdoor temperature)................128
2.3
Jumper and Switch Settings.................................................................128
3. Application of Silicon Grease to a Power Transistor and
a Diode Bridge ....................................................................................129
Part 9 Appendix.........................................................................130
1. Piping Diagrams..................................................................................131
1.1
Indoor Unit............................................................................................131
1.2
Outdoor Unit .........................................................................................132
2. Wiring Diagrams..................................................................................133
2.1
Indoor Unit............................................................................................133
2.2
Outdoor Unit .........................................................................................134