SiBE07-618_C
Trial Operation and Field Settings
125
Part 8
Trial Operation and
Field Settings
1. Trial Operation ....................................................................................126
2. Field Settings ......................................................................................127
2.1
When 2 Units are Installed in 1 Room..................................................127
2.2
Facility Setting Switch (cooling at low outdoor temperature)................128
2.3
Jumper and Switch Settings.................................................................128
3. Application of Silicon Grease to a Power Transistor and
a Diode Bridge ....................................................................................129