9
Installation
Pr
ocedure
Installation
OFF
ON
Operation setting and parameter setting
are enabled. (Standard factory setting)
Transformer power supply terminal block
For different-voltage model (–E) only
Alarm output
L1
L2
L3
Short-circuit bar
Control
board
60
61
62
63
64
65
66
67
9
10
11
12
13
30
31
Operation setting and parameter
setting cannot be changed.
Conducted
by user
Temperature range
warning output
Remote control input
For connection of optional protection
device (OP)
For connection of machine
temperature tuning sensor
No connection
No connection
CN2
(Ground terminal)
PROTECT SW
(Erroneous operation prevention)
Signal cable terminal block
Power supply
terminal block
Top view
Outline of electrical equipment box (Typical)
Connection of remote control input
To execute remote control, connect the cable according to the procedure below.
Local procurement items
Component
Single-pole, single-throw remote control switch, or “a” contact that enables operation command output
Note) Select a switch whose minimum allowable load is 12 VDC and 5 mA.
Single-core cable:
φ
1.2 (AWG16), or twisted cable: 1.25 mm
2
(AWG16), M3 crimp terminal
Wiring material
1
E3:
E2:
E1:
Select a terminal according to the main power supply voltage.
415
480
415
480
415
480
440V 460
440 460
440 460
380V 400
380 400
380 400
220V
(Ground)
220
220
230
230
230
W
V
U
Remove the short-circuit bar (between terminals [10] and [11]) on the terminal block in
the electrical equipment box.
Connect the cable specified in above between terminals [10] and [11].
∗
12 VDC is applied across these terminals (Terminal [10]: negative polarity, [11]: positive polarity).
2
3
1
PIM00132A_EN.fm 9 ページ 2007年9月20日 木曜日 午後3時4分