5
3P130768-6L English
(4) Check the unit is horizontally level.
CAUTION
Use a level to make sure that the unit is level and that
the tilt (downward slope) to the drain piping connection
is within 1°. (Refer to Fig. 5)
(One thing to watch out for in particular is if it is installed so
that the slope is not in the direction of the drain piping, as
this might cause leaking.)
(5) Tighten the upper nut.
(6) Attach the accessory duct connecting flanges using
the included screws to the outlet and intake holes
(a total of four).
When attaching, make sure the alignment markings on the
unit match up with the triangle on the each duct connecting
flange.
(Refer to Fig. 6)
6
DRAIN PIPING AND WATER SUPPLY
WORK
(1) Install the drain piping.
•
Make sure the drain works properly.
•
In case of the direct duct connection system, there is neg-
ative pressure inside the unit relative to atmospheric
pressure when the unit is running, so be sure to provide
drain trap on the drain outlet.
(Refer to Fig. 7-1)
CAUTION
Do not connect the drain piping directly to sewage pipes
that smell of ammonia. The ammonia in the sewage might
enter the indoor unit through the drain pipes and corrode
the heat exchanger (Direct expansion coil).
•
Keep the drain pipe short and sloping downwards at a
gradient of at least 1/100 to prevent air pockets from
forming.
(Refer to Fig. 7-2)
•
If converging multiple drain pipes, install according to the
procedure shown below. (Install a drain trap for each
indoor unit.)
CAUTION
Water accumulating in the drain piping can cause the
drain to clog.
•
The diameter of the drain pipe should be greater than or
equal to the diameter of the connecting pipe.
(pipe size: PT3/4B)
•
When piping passes indoors, always insulate it all the
way to the base of the drain socket.
•
In areas where freezing may occur, always take steps to
prevent the pipes from freezing.
•
Make sure water doesn’t leak from the drain pipes.
•
Avoid bends and curves in the pipes to prevent them get-
ting clogged.
•
If you are using central drain piping, follow the procedure
outlined in the figure 7-2.
•
Select central drain pipes of proper size according to the
capacity of the connected unit.
•
Make sure the tip of the drain pipes opens out into a loca-
tion where the drainage can be safely processed.
(2) After piping work is finished, check drainage flows
smoothly.
•
Test the drainage by pouring around 1000cc of water into
the drain pan through the inspection hole by removing the
maintenance cover (10 screws) or through the outlet duct
joint of supply air to room (SA).
(Refer to Fig. 8)
(3) Make sure that heat insulation work is executed on the
following 2 spots to prevent any possibility water leak-
age due to dew condensation.
• Indoor drain piping
• Drain outlet
Level
Level
Dr
a
in hole
Horizont
a
l line
Dr
a
in hole
D
u
ct connecting
fl
a
nge
1
0
or
le
ss
1
0
or
le
ss
Fi
g
. 5
Fi
g
. 6
D
u
ct connecting fl
a
nge m
a
rking
S
crew
s
(Acce
ss
ory)
(6pc
s
.×4, tot
a
l 24pc
s
.)
(RA i
s
a
φ
3
indent
a
tion)
D
u
ct connecting fl
a
nge
D
u
ct connecting
fl
a
nge
Unit
a
lignment
Att
a
ched dr
a
in ho
s
e
Bottom of
u
nit
50 mm
or more
50 mm
or more
Fi
g
. 7-1
100 mm
or more
Fi
g
. 7-2
Centr
a
l dr
a
in piping
(In
s
t
a
ll with
a
downw
a
rd
s
lope of
a
t le
as
t 1/100)
M
a
inten
a
nce cover
B
u
cket
Port
ab
le p
u
mp
(Loc
a
lly proc
u
red)
(Fig
u
re
s
how
s
VKM-GBMV1)
(Loc
a
lly proc
u
red)
(Loc
a
lly proc
u
red)
D
u
ct connecting fl
a
nge
Su
pply
a
ir to room (
S
A)
(Acce
ss
ory)
Dr
a
in piping
Dr
a
in o
u
tlet
Fi
g
.
8
01_EN_3P130768-6L.fm 5 ページ 2013年3月21日 木曜日 午前11時48分
Содержание VKM100GBMV1
Страница 18: ...white page fm 1...
Страница 19: ...white page fm 2...
Страница 20: ...EM12A038 1303 3P130768 6L DE 00_CV_3P130768 6L fm 2...