c. If the measured pre-lift value deviates
from the specified limit, replace the pin
(14, 16), lift piece (13), spacer (15), and
nozzle assembly (A) with a new “nozzle
service kit”.
•
Inspection of secondary opening pressure
a. After confirming the pre-lift, operate the
nozzle tester and increase the internal
pressure up to 350 ~ 450 kgf/cm
2
to fully
lift the needle valve.
b.
Release the nozzle tester handle to
decrease the tester pressure, then take
a note of the movements of the dial
gauge.
c. Take the indicated value on the pressure
gauge at the point of time when the nee-
dle of the dial gauge indicates the speci-
fied needle valve lift value. (In general,
pre-lift “ “ + 0.05mm. Refer to following
figure.)
- 114 -
13
14
15
16
A
EQM4053I
L
0
+0.05
EQM4054I
Secondary
opening pressure
350~450
kgf/cm
2
Primary opening
pressure
Amount of lift
0
20
40
60
80
100
0
EQM4055I
90
80
70
60
50
40
30
20
10
0
200
100
0
500
400
300
EQM4056I