background image

RZN 43xx-E

9/16

Connection GE 628 (-L) V2

-

Supply wires

and

branch off parallel

-

is looped through

all the cables up to the group end.

Mot. a

Mot. b

Monitoring

Connection in case of line branch (GE 628 (-L) V2)

The smoke vent control panel is designed for opening smoke vent devices,
which operate by thermal lifting and through automatic fire recognition
devices (thermal detector, smoke detector). They are triggered either
automatically or manually by smoke detectors at an early stage of a fire and
remain in an opened position without further power consumption. In such a
case, the functional retention of the electrical system is only required at the
early stage of fire. Secured wiring with protection against mechanical
damage is required in accordance with DIN 18232 Part 2.7.2.4.

Cable from the Smoke and heat vent control panel to connect the drive.
Drive lines have a monitoring wire in which fire recognition devices (thermal
maximal detector e.g. THE) can be looped-in:
- standard guidelines for line systems MLAR or safety line with function

retention ... E30, installed in accordance with DIN 4102*.

An increased cable function retention time may be required when drive lines
are installed through areas of the building which are not monitored.
- standard guidelines for line systems MLAR or safety line with function

retention ... E90 installed in accordance with DIN 4102*.

Control cable (Group):

Cables through non-monitored areas:

* Please note: No type designation is given for these cables because of a

large variety on the market. Please consult your D+H distributor about
these.

! The earth conductor must not be wired !

cross section (mm²) =

80

* Connect in parallel 2 wires for each drive line.
** Connect in parallel 3 wires for each drive line.

simple cable length (m) x total current

total

consumption

1

2

3

4

5

6

7

8

9

10

A

3x 1,5 mm²

120

60

40

30

24

20

17

15

13

12

m

3x 2,5 mm²

200 100

65

50

40

33

28

25

22

20

m

*5x 2,5 mm²

400 200 130 100

80

65

56

50

44

40

m

**7x 2,5 mm²

600 300 200 150 120 100

85

75

67

60

m

Cable for GE 628 (-L) V2

Connection examples (GE 628 (-L) V2)

control

panel

M

25m

3 x 2,5²

M

M

M

M

M

M

M

Example 1:

1 line

Simple wiring, however unfavourable for voltage drop:
All drives on one cable.

Example 2:

2 lines

Control panel in the centre, one side wired as branch, the other one as
terminal line. 4 wires are required for each branch!

Example 3:

2 lines on one side

Branch and terminal line in same direction.
Number of drives varies in accordance with lengths of lines. 4 wires are
required for each branch!

Example 4:

3 lines

Three cable runs are provided because of the very long distances:
2 cable runs with 3 drives each over 65 m line as branch and 1 cable run with
2 drives over 200 m line. 4 wires are required for each branch.

Group plug-in card GE 628 (-L) V2 (

)

continuation

M

50m

3 x 2,5²

4 x 2,5²

branch box

50m

M

M

M

M

M

M

M

control

panel

M

control

panel

65m

40m

4 x 2,5²

3 x 2,5²

M

M

M

M

M

M

M

branch box

M

65m

65m

200m

4 x 2,5²

4 x 2,5²

5 x 2,5²

M

M

M

M

M

M

M

control

panel

branch box

control panel

Mot. b

76

5

Mot. a

monitored

Mot. a

Mot. b

Mot. a

Mot. b

branch box
on motor

branch box

branch box

branch box
on motor

switch further

branchings

alike

Vent button

drives*

LT 43

(-SD)

EM 47 K

terminal module

lenght of line and cross
sections, see page 9

close

–N

OPEN

signal

open

close

OPEN

signal

(only

-SD)

–N

open

monitoring

Mot.a

Mot.b

5

6

7

1

2

3

4

LT

MOT

L

P

GE

black

black

orange

2x47k

W

branch
box by customer

first to
penultimate
drive

LT

4

3

L

P

Mot. b

-HS*

Mot. a

* For detailed information concerning the connection,

please refer to the instruction for use of respective drive.

last
drive

Mot. b

-HS*

Mot. a

Содержание RZN 43-E Series

Страница 1: ...nstallation commissioning repair and service The highest national and international quality standards are therefore reliably fulfilled The comprehensive network of D H service and sales partners is at...

Страница 2: ...d by D H for carrying out this maintenance competently and will be automatically provided with the latest maintenance instructions Following tests must be carried out during maintenance External exami...

Страница 3: ...heat ventilation system under alarm conditions will occur if the inner temperature exceeds 72 C caused by the radiant heat from a fire in the immediate vicinity of the installation location VE 530 Se...

Страница 4: ...er power lines In case of a cable with green yellow this must Cable and terminal boxes have to be labeled ground wire not be used Slot E1 E2 AM 44 Z Alarm cutoff module TR 42 Cutoff relay module WFR 4...

Страница 5: ...function can be deactivated via the servicetool Attention Reset of the service timer can be carried out by a specialist company only who has been authorized by the appliance manufacturer close red gre...

Страница 6: ...switched OFF ON for Smoke Detector Reset at the control panel This line is released by a line connected in series Every previous plug in slot after the releasing line must be occupied Both the lines...

Страница 7: ...rst to penultimate smoke vent button each Malfunc tion 1 shunt connection by customer Line plug in card LE 513 continuation Parallel connection of RT 45 on LE 513 Terminal resistor for line monitoring...

Страница 8: ...During a period of 30 minutes the smoke vent is triggered at intervals of 2 minutes in accordance with VdS 2581 The group plug in card can be triggered in OPEN direction viaAz signals The group plug i...

Страница 9: ...llel 3 wires for each drive line simple cable length m x total current total consumption 1 2 3 4 5 6 7 8 9 10 A 3x 1 5 mm 120 60 40 30 24 20 17 15 13 12 m 3x 2 5 mm 200 100 65 50 40 33 28 25 22 20 m 5...

Страница 10: ...s overridden in the case of an alarm from the Smoke and heat vent system The function Master CLOSE e g in the case of rain or a timer has a higher priority than the servo function and can be activated...

Страница 11: ...g Mot a Mot b drive with SGI or ZA SG SG I black black orange 2x47kW branch box by customer terminal module EM 47 K LT MOT Mot a Mot b HS SG I SG I SGI 0 10 V 0 10 V SG 0 10 V 0 20 mA 4 20 mA BMS Mot...

Страница 12: ...1 ZMP2 1 2 3 4 5 6 7 8 9 10 11 WE 516 rain wind wind 1 2 4 3 5 7 6 8 9 R W WRG 82 S 1 1 S 1 2 P3 P4 rain wind N AZ ZZ1 T ITR 79 1 6 2 7 4 3 5 230VAC 5 1 3 RTR 230 open close potential free wind rain i...

Страница 13: ...w lock plug in card AE 525 A Function of DIP switches S1 1 on ON failure alarm S1 2 no function DIP switch factory setting DIP switch factory setting Function of DIP switches S1 1 on ON failure alarm...

Страница 14: ...1 Bridge diagnostic pin against middle pin on line plug in card Check fuse connections cables t clamps smoke detectors and external control 2 Bridge diagnostic pin against middle pin on line plug in c...

Страница 15: ...rol panel with reset button 2 Press concealed button in smoke vent button smoke vent closes 3 Red display LED in button and on line plug in unit goes out 1 Trigger external control if available 2 Smok...

Страница 16: ...org Sasse Str 28 32 22949Ammersbek Tel 40 605 65 Fax 40 605 65 254 Germany 49 239 49 E Mail info dh partner com www dh partner com 2010 D H Mechatronic AG Ammersbek Technische nderungen vorbehalten Ri...

Отзывы: