background image

99.821.70 3.5/01/12

D+H Mechatronic AG
Georg-Sasse-Str. 28-32
22949 Ammersbek

Tel.

40-605 65

Fax

40-605 65 254

, Germany

: +49

239

: +49

E-Mail: [email protected]

www.dh-partner.com

© 2010 D+H Mechatronic AG, Ammersbek
Technische Änderungen vorbehalten. /
Rights to technical modifications reserved.

Содержание RZN 43-E Series

Страница 1: ...nstallation commissioning repair and service The highest national and international quality standards are therefore reliably fulfilled The comprehensive network of D H service and sales partners is at...

Страница 2: ...d by D H for carrying out this maintenance competently and will be automatically provided with the latest maintenance instructions Following tests must be carried out during maintenance External exami...

Страница 3: ...heat ventilation system under alarm conditions will occur if the inner temperature exceeds 72 C caused by the radiant heat from a fire in the immediate vicinity of the installation location VE 530 Se...

Страница 4: ...er power lines In case of a cable with green yellow this must Cable and terminal boxes have to be labeled ground wire not be used Slot E1 E2 AM 44 Z Alarm cutoff module TR 42 Cutoff relay module WFR 4...

Страница 5: ...function can be deactivated via the servicetool Attention Reset of the service timer can be carried out by a specialist company only who has been authorized by the appliance manufacturer close red gre...

Страница 6: ...switched OFF ON for Smoke Detector Reset at the control panel This line is released by a line connected in series Every previous plug in slot after the releasing line must be occupied Both the lines...

Страница 7: ...rst to penultimate smoke vent button each Malfunc tion 1 shunt connection by customer Line plug in card LE 513 continuation Parallel connection of RT 45 on LE 513 Terminal resistor for line monitoring...

Страница 8: ...During a period of 30 minutes the smoke vent is triggered at intervals of 2 minutes in accordance with VdS 2581 The group plug in card can be triggered in OPEN direction viaAz signals The group plug i...

Страница 9: ...llel 3 wires for each drive line simple cable length m x total current total consumption 1 2 3 4 5 6 7 8 9 10 A 3x 1 5 mm 120 60 40 30 24 20 17 15 13 12 m 3x 2 5 mm 200 100 65 50 40 33 28 25 22 20 m 5...

Страница 10: ...s overridden in the case of an alarm from the Smoke and heat vent system The function Master CLOSE e g in the case of rain or a timer has a higher priority than the servo function and can be activated...

Страница 11: ...g Mot a Mot b drive with SGI or ZA SG SG I black black orange 2x47kW branch box by customer terminal module EM 47 K LT MOT Mot a Mot b HS SG I SG I SGI 0 10 V 0 10 V SG 0 10 V 0 20 mA 4 20 mA BMS Mot...

Страница 12: ...1 ZMP2 1 2 3 4 5 6 7 8 9 10 11 WE 516 rain wind wind 1 2 4 3 5 7 6 8 9 R W WRG 82 S 1 1 S 1 2 P3 P4 rain wind N AZ ZZ1 T ITR 79 1 6 2 7 4 3 5 230VAC 5 1 3 RTR 230 open close potential free wind rain i...

Страница 13: ...w lock plug in card AE 525 A Function of DIP switches S1 1 on ON failure alarm S1 2 no function DIP switch factory setting DIP switch factory setting Function of DIP switches S1 1 on ON failure alarm...

Страница 14: ...1 Bridge diagnostic pin against middle pin on line plug in card Check fuse connections cables t clamps smoke detectors and external control 2 Bridge diagnostic pin against middle pin on line plug in c...

Страница 15: ...rol panel with reset button 2 Press concealed button in smoke vent button smoke vent closes 3 Red display LED in button and on line plug in unit goes out 1 Trigger external control if available 2 Smok...

Страница 16: ...org Sasse Str 28 32 22949Ammersbek Tel 40 605 65 Fax 40 605 65 254 Germany 49 239 49 E Mail info dh partner com www dh partner com 2010 D H Mechatronic AG Ammersbek Technische nderungen vorbehalten Ri...

Отзывы: