FEP INITIALIZATION AND BUILT-IN SELF TEST
4-2
2410-41, 2410-42 and 2410-43 FEP Maintenance & Support Guide
Revision 1.0, May 2006
All LEDs Off
System Level initialization continuing.
Port 3 Act On
MPC8260 CPM reset and initialized.
Serial port initialized.
Instruction cache enabled.
Data cache enabled.
Exception vectors initialized.
CPCI bridge initialized.
Port 3 ACT On,
Port 3 Lnk On
InitBoard Completed.
Entering pSOSystem.
LEDs are under application control at this
point.
TFTP Boot application frimware does not utilize
the LEDs.
All LEDs On
Reset Applied