7
Start-up and Shut-down the Inverter
7.1 Start-up the Inverter for On Grid Operation
1.
Connect AC power cord from inverter’s AC-In to the wall’s electrical socket.
2.
Connect Output to attached Load (ex. Appliances).
3.
When exposing PV panel under sunlight, the inverter will start working automatically if input voltage
is higher than 27Vdc.
PV Module
Electrical Grid
Appliances
(Emergency usage)
Multiple charge, 5V/2A
(2A max for each USB and total)
CPSHB300ETR
Optional external battery
VRLA, 24V (12V*2)
DC
AC
USB
Fig. 7-1 Power flow of On-Grid operation
7.2
USB Charger Only
With PV power,
When PV voltage has sufficient power, USB charger will automatically operate.
Without PV power,
1.
Make sure the inverter is staying in shutdown mode.
2.
Disconnect Off-Grid plug.
3.
Press and hold the button until all LEDs are green, it takes around 1-2s (release the button
immediately when the LEDs are green).
4.
USB charger starts to operate.
7.3
Start-up the Inverter for Off Grid Operation
With PV power,
1.
Disconnect inverter Grid plug.
2.
Turn on the DC switch or connect PV connectors, press and hold the button of inverter until
Off-Grid LED is green (release the button immediately when that LED is green).
3.
Inverter will start Off-Grid operation if the input voltage is higher than 27V or battery voltage is
User Manual
19 Hybrid CPSHB300ETR
Содержание CPSHB300ETR
Страница 1: ...User s Manual CPSHB300ETR Cyber Power Systems Inc www cyberpower com...
Страница 2: ......
Страница 18: ...Fig 5 4 Location of extended battery connector User Manual 12 Hybrid CPSHB300ETR...
Страница 33: ...Note...
Страница 34: ...Note...
Страница 35: ......
Страница 36: ...www CyberPower com K01 0000591 00...