5.3.4
Wiring AC Output
Conditions for the AC Connection
Measure the grid’s voltage and frequency. It should be: (Voltage: 220~240VAC single-phase; Frequency:
50Hz/60Hz).
1.
Open the transparent cover and plug in the AC power cord, the other end of power cord plug to
electrical socket
2.
Plug-in the load power cord if needed.
(Different area has different plug type)
or
or...
To loads (appliances)
Electrical socket
~~
Fig. 5-5 Grid output and standalone output connections
6
Commissioning
6.1 Commission the Inverter
1)
Remove the cover from the PV panel.
2)
Check the PV and AC voltage.
3)
If there’s DC switch, turn it to ON position.
If the inverter is connected with PV panel and the input voltage is higher than 27Vdc, while the AC
grid is not connected yet, LEDs will display as below. PV power would be transferred to charge the
batteries.
PV >27V and <50V
(Off)
4)
Connects inverter Grid O/P to electrical socket, it will bypass the Grid power to standalone output
automatically.
5)
Under normal operating conditions, the Grid LED turns green.
User Manual
13 Hybrid CPSHB300ETR
Содержание CPSHB300ETR
Страница 1: ...User s Manual CPSHB300ETR Cyber Power Systems Inc www cyberpower com...
Страница 2: ......
Страница 18: ...Fig 5 4 Location of extended battery connector User Manual 12 Hybrid CPSHB300ETR...
Страница 33: ...Note...
Страница 34: ...Note...
Страница 35: ......
Страница 36: ...www CyberPower com K01 0000591 00...