SERA2, INSTALLATION INSTRUCTIONS
040220C
INSTALLATION INSTRUCTIONS
II12
Power Up the Brewer (cont.)
35 When the water in the tank rises to the correct level, the
heating elements will turn on automatically. Depending
on the incoming water temperature and the electrical
TQFDJmDBUJPOTUIFXBUFSUBOLUZQJDBMMZSFRVJSFT
minutes to reach the factory set operating temperature.
When the water has heated, “Ready to brew” will appear
on the LCD screen.
36 Perform a brew cycle of a least 12 oz. (350 ml) to purge
any remaining air from the system. See
OPERATING
INSTRUCTIONS
. During the initial brew cycle and
XIFOFWFSUIFmMUFSJTSFQMBDFEZPVNBZIFBSUIFTPVOET
PGBJSCFJOHQVSHFEGSPNUIFmMUFSUVCJOHBOEXBUFSUBOL
Installing the Optional Brew Basket Holder
37 Make sure the toggle switch on the back of the water
tower is in the OFF position.
38 Thread the shaft of the brew basket holder into the hole
(located toward the back) on the underside of one of the
brew heads. Hand tighten into place.
IMPORTANT:
When operating the brewer at higher
elevations, reduce the factory set operating
temperature by 2°F (1°C) for each 1000 feet
(300 m) of elevation above 4000 feet (1200 m). See
PROGRAMMING GUIDE
.
Figure 21 - Brew Basket Holder Installation