16
PRE-SPRAY CHECK LIST
1. Verify that the remote control box is within easy reach of the operator.
2.
Verify that the adjustable nozzle boom is in the correct position as required for the
spraying operation to be accomplished, and that the ring clamp which allows this
positioning is tight.
3. Verify that the engine has sufficient fuel and is properly lubricated.
4. Verify that the blower has been serviced.
5. Inspect all hoses for abnormal conditions.
6. Verify that no foreign objects or tools have been left in or about the machine.
7. Verify that the sufficient amount of formulation is in the tank and that the tank
filling cap is tight and it’s air vent hole is not restricted.
8. Verify that the battery is mounted securely and cable connections are proper
and tight.
9. Verify that all safety equipment is in place and is in proper working order.
10. Verify that the flow rate control has been calibrated and is dispensing formulation in
accordance with the manufacturers label requirements.
CAUTION
BEFORE PROCEEDING WITH ANY SPRAYING OPERATION, THE OPERATOR
SHOULD BE THOROUGHLY FAMILIAR WITH STARTING AND STOPPING THE
MACHINE AND WITH ALL THE OPERATING^ CONTROLS. IF YOU ARE
OPERATING THE MACHINE FOR THE FIRST TIME, EXERCISE THE MACHINE
THROUGH ITS FULL OPERATIONAL SEQUENCES FROM A POSITION OF FULL
VISIBILITY OF THE MACHINE BEFORE OPERATING THE MACHINE FULLY
REMOTE. THIS IS ALSO A GOOD IDEA FOR EXPERIENCED OPERATORS WHO
MAY BE OPERATING A NEW MACHINE OR WHO MAY BE REACTIVATING A
MACHINE AFTER REPAIRS OR A PERIOD OF INACTIVITY. REFER TO THE
ENGINE MANUAL FOR STARTING AND STOPPING INSTRUCTIONS.
Содержание MAXI-PRO 2D ULV
Страница 6: ...6 MAJOR COMPONENTS DIAGRAM ...
Страница 9: ...9 ...
Страница 39: ...39 ...
Страница 43: ...43 BOOM ASSEMBLY MAXI PRO 2D P N 64905 ...
Страница 50: ...50 ...