4
Maintenance
Topics Covered in this Chapter
Inspecting and Cleaning the Enclosure
Inspecting and Tightening the Connections
Guidelines for Inspecting the 110WX Sensor (Weather Station)
Inspecting the RG-11 Rain Sensor
Inspecting and Cleaning the Enclosure
Inspecting the enclosure and keeping them clean can help prolong the proper functioning of the module.
Before You Begin
CAUTION
Disconnect the voltage supply before servicing or performing any maintenance
operations.
WARNING
Secure the screws on the enclosure once the wiring is completed or when servicing.
• Every few months, open and inspect the enclosure for moisture or dust build-up.
WARNING
All service and maintenance must be performed by a maintenance or service
personnel.
• Using a damp cloth, wipe clean the exterior of the enclosure.
WARNING
Do not pressure wash the controller.
Inspecting and Tightening the Connections
At some point, the electrical connections must be verified to ensure the connections are not loose and the
installation is always safe. The inspection ensures that no overheating occurs on the electrical
connections.
1. AP/Cumberland recommends the connections on power and control terminals to be verified every 3-
12 Months.
2. If wires are loose, tighten to the torque recommendations specified for the terminal.
3. Replace any damaged wires
PNEG-2248
Weather Station
27
Содержание AP Cumberland EDGE
Страница 1: ...EDGE Weather Station Installation Manual PNEG 2248 Version 02 Date 05 12 19 PNEG 2248...
Страница 4: ...NOTES 4 PNEG 2248 Weather Station...
Страница 10: ...NOTES 10 PNEG 2248 Weather Station...
Страница 18: ...NOTES 18 PNEG 2248 Weather Station...
Страница 26: ...Chapter 3 Basic Connections and Wiring 26 PNEG 2248 Weather Station...
Страница 32: ...NOTES 32 PNEG 2248 Weather Station...