8
Culligan® Aqua-Cleer® CC Basic™
8
Cat. No. 01021819
All personnel should be aware of company requirements for their own cleanliness and hygiene when
NOTE
installing, servicing or sanitizing a unit
If the treatment components have remained in the unit for more than 24 hours since they were flushed
NOTE
and transported to a customer location, it is highly recommended that they get flushed to the drain
before installing.
Install a pressure regulator, if needed, on the incoming water supply line, set to 40-45 psi.
The unit should not be exposed to direct sunlight, heat sources, or an ambient air temperature above
90°F (32°C) or below 37°F (3°C).
Make sure there is adequate clearance around the unit to allow for heat dissipation of the condenser.
The warmer the environment is surrounding the unit, the more clearance that is required. A typical
office install should require 2 inches of clearance all around the machine. Installs in factories, ware-
houses, and garages, where the ambient temperature is above 80°F, will require a minimum of 4 inches
clearance.
Install the Water Treatment System Components
The water treatment system components are installed outside the CC Basic™ POU Cooler. See Appendix for typical
treatment system types. Detailed instructions for the preparation and sanitization of treatment components are in Appen-
dixes A, B, C, and D.
Position the Unit
Locate the unit as close to the water supply and the electrical connections as possible.
1.
Level the unit so the POU kit floats will work properly.
2.
Check that the indicator is in the GREEN position.
3.
Establish the Water Connection
Flush the feed water tubing to the unit before making the connection to the ¼" tubing at the rear of the unit.
1.
Connect the unit to the water.
2.
Do not turn on the power switches yet.
NOTE
Slowly turn on the water supply. Check all connections for leaks.
3.
Check that the water treatment system begins to fill the reservoir.
4.
Once the reservoir fills, depress and hold the Hot button and verify that water dispenses from the faucet.
5.
Because it will take some time for the RO system to fill the reservoir, take along a few jugs of freshly
NOTE
prepared RO water from your shop to fill the reservoir for the first time.
Depress and hold the Cold dispense button until water dispenses from the faucet.
6.
Plug the unit into a power supply.
7.
The unit is now live. Take suitable safety precautions.
CAUTION!
Turn ON the Power Switch to start the chilling and heating processes.
8.
Installing the CC Basic™