C550c Operation Manual
5 System setup
93
5 System setup
When you power on the controller for the first time, you must carry out various setup tasks. Make sure
you complete these tasks before you start any pipeline surveys.
5.1 Insert the fuse
A 5A 32V MINI blade fuse is supplied separately
with the controller. You must insert the fuse
before powering on the controller for the first
time.
Open the cover of the auxiliary connection panel
and insert the fuse into the fuse holder. Then
close the cover.
Warning! You must remove the fuse to
isolate the battery when the controller is
transported by air!
Fig. 5.1: Fuse holder
(
1
)
in auxiliary connection panel.
1
Содержание flexitrax C550c
Страница 19: ...C550c Operation Manual Contents www cuesinc com 19 13 Open Source Software 278 14 Index 279 Contact us 286...
Страница 55: ...C550c Operation Manual 4 System assembly www cuesinc com 55 Fig 4 6 Pipe clearance diagrams part 1...
Страница 56: ...C550c Operation Manual 4 System assembly www cuesinc com 56 Fig 4 7 Pipe clearance diagrams part 2...
Страница 57: ...C550c Operation Manual 4 System assembly www cuesinc com 57 Fig 4 8 Pipe clearance diagrams part 3...
Страница 103: ...C550c Operation Manual 5 System setup www cuesinc com 103 Fig 5 6 Settings menu...
Страница 216: ...C550c Operation Manual 7 Surveys www cuesinc com 216 Fig 7 6 Gmail account home...
Страница 218: ...C550c Operation Manual 7 Surveys www cuesinc com 218 Fig 7 9 Gmail Less secure app access...