C550c Operation Manual
2 Quick Start
24
2 Quick Start
Note: This section provides quick start instructions for experienced users only. We recommend that
new users read this manual fully before proceeding.
To get started with the C550c system, follow these steps:
1 Make sure the PSU, whether separate or part of the powered drum, and controller are both powered
off.
Note: This Quick Start section assumes that the controller battery is charged. For details about
charging the battery, see
2 Set up the controller:
a.
(Optional)
Mount the controller onto the drum using the supplied clamp.
b. Connect the drum to the controller using the link cable (item 4 on
page 31
c. Connect the drum to the down-hole equipment relevant to the survey required.
3 Turn the power switch on the PSU and press the power button on the controller to turn the system
on.
The controller takes around 15 seconds to display the first screen.
Содержание flexitrax C550c
Страница 19: ...C550c Operation Manual Contents www cuesinc com 19 13 Open Source Software 278 14 Index 279 Contact us 286...
Страница 55: ...C550c Operation Manual 4 System assembly www cuesinc com 55 Fig 4 6 Pipe clearance diagrams part 1...
Страница 56: ...C550c Operation Manual 4 System assembly www cuesinc com 56 Fig 4 7 Pipe clearance diagrams part 2...
Страница 57: ...C550c Operation Manual 4 System assembly www cuesinc com 57 Fig 4 8 Pipe clearance diagrams part 3...
Страница 103: ...C550c Operation Manual 5 System setup www cuesinc com 103 Fig 5 6 Settings menu...
Страница 216: ...C550c Operation Manual 7 Surveys www cuesinc com 216 Fig 7 6 Gmail account home...
Страница 218: ...C550c Operation Manual 7 Surveys www cuesinc com 218 Fig 7 9 Gmail Less secure app access...