C550c Operation Manual
6 Operating the system
179
5
(Applies to Structured and WinCan surveys only)
Fill out the details required for your chosen survey
standard.
-
The current field is highlighted in gray.
-
Mandatory fields are highlighted in yellow.
Tip: Press the Super tab button to quickly tab through the mandatory fields only. You can
fill in the other fields later; see
-
Press the
arrow keys to move through
all
the header fields.
-
Fields with buttons have a drop-down menu. For drop-down menu shortcuts, see
page 236
-
Press Save to save the form.
6
(Applies to Structured and WinCan surveys only)
Press the
panel button
to start recording.
7 Now carry out the video inspection. Use the controller tools to:
-
Pause the recording, rotate the camera, use a sonde, mute an audio commentary, and highlight pipe
defects. See
page 182
-
Take a photo. See
page 183
-
Add an observation. See
page 226
-
Add a Text page. See
page 184
Содержание flexitrax C550c
Страница 19: ...C550c Operation Manual Contents www cuesinc com 19 13 Open Source Software 278 14 Index 279 Contact us 286...
Страница 55: ...C550c Operation Manual 4 System assembly www cuesinc com 55 Fig 4 6 Pipe clearance diagrams part 1...
Страница 56: ...C550c Operation Manual 4 System assembly www cuesinc com 56 Fig 4 7 Pipe clearance diagrams part 2...
Страница 57: ...C550c Operation Manual 4 System assembly www cuesinc com 57 Fig 4 8 Pipe clearance diagrams part 3...
Страница 103: ...C550c Operation Manual 5 System setup www cuesinc com 103 Fig 5 6 Settings menu...
Страница 216: ...C550c Operation Manual 7 Surveys www cuesinc com 216 Fig 7 6 Gmail account home...
Страница 218: ...C550c Operation Manual 7 Surveys www cuesinc com 218 Fig 7 9 Gmail Less secure app access...