PROGRAMMING (PH)
Through the front panel it is possible to set and to modify all the working parameters of operating setting of the pump.
Pump Setup
The pump goes in measure mode, on display
will show the measure's value.
Press OK button to enter in menus; the first is
SETPOINT menu, using + and - buttons you will
scroll all 3 menus.
Setpoint Menu
Calibration Menu
Alarms Menu
SETPOINT setting
To have the pump operative it's mandatory set the following data: Setpoint values, type of dosing, manual or proportional
dosing and flow rate percentage.
SETPOINT value
From measuring status, pressing OK, the pump will
go in SETPOINT programming phase. Setpoint icon
will flash. Pressing OK again, the setpoint value
saved will flash and can be adjusted using + and -
buttons.
Pressing OK, the setpoint value will be memorized.
The pump automatically will go in DIRECTION
menu
78
ENGLISH
Содержание BOMBAPRO PH-RX
Страница 2: ......
Страница 7: ...Limpieza y mantenimiento del electrodo 30 DIBUJOS 117 Bomba 117 Cuerpo bomba 118 ESPAÑOL 7 ...
Страница 32: ......
Страница 35: ...DISEGNI 117 Pompa 117 Corpo Pompa 118 ITALIANO 35 ...
Страница 60: ......
Страница 63: ...DRAWINGS 117 Pump 117 Pump head 118 ENGLISH 63 ...
Страница 88: ......
Страница 91: ...DESSINS 117 Pompe 117 Corps de pompe 118 FRANÇAIS 91 ...
Страница 116: ......
Страница 119: ......
Страница 120: ...CDMU 00203ML1A 03 2016 ...