Crown Royal Stoves RS7200E Скачать руководство пользователя страница 43

 
 

WARRANTY CLAIM FORM

 

 

 

 

 

 

 

Date: ______________________ 

 
Distributor/Dealer Name: __________________________________________________________________ 

Address: ________________________________________________________________________________ 

City: _______________________________________ State: _________________ Zip: __________________ 

Phone: __________________________________________ Fax: ___________________________________ 

 

Customer’s Name: ________________________________________________________________________

 

Address: ________________________________________________________________________________ 

City: _______________________________________ State: _________________ Zip: __________________ 

Phone: ___________________________________________ Fax: __________________________________ 

 

Claim conditions apply and cannot exceed warranty statement and procedure policy!   
Please send this form, bill of sale and pictures back to 

[email protected]

.   

Warranty work completed without prior authorization may be denied. 

 

(Process from start to finish 

 When reviewing all information sent in by customer, we make sure the stove is registered in original 

owners name, verify mandatory chemical was added to the system and yearly test results were sent in and came back satisfactory.  
After approved you find a local welder to give an estimate to repair the stove, which we approve and tell you the percentage 
covered.  This warranty is prorated so it will be covered by a percentage.  After you pay the bill you submit a copy and a check is 
submitted back to you.  Complete process usually takes 30 days.  Under some circumstances, we may require furnace to be shipped 
back to our facility.) 

 
 
 
Model: ______________________________________  S/N: ________________________________________ 

Purchase Date: _______________________________ Install Date: ___________________________________ 

Description of Claim:  ________________________________________________________________________ 

__________________________________________________________________________________________ 

__________________________________________________________________________________________ 

__________________________________________________________________________________________

__________________________________________________________________________________________

__________________________________________________________________________________________

__________________________________________________________________________________________

__________________________________________________________________________________________

__________________________________________________________________________________________

__________________________________________________________________________________________ 

 

WARRANTY CLAIN FORM 

 

43

Содержание RS7200E

Страница 1: ...MANUAL EPA QUALIFIED RS7200E INSTALLATION OPERATION MAINTENANCE MANUAL MAILING PO BOX 1237 SHIPPING 2716 CRESCENT DR INTERNATIONAL FALLS MN 56649 PH 866 361 7355 FX 218 283 5786 WEB WWW CROWNROYALSTO...

Страница 2: ......

Страница 3: ...7 BRAZED PLATE SETUP INSTALLATION 18 WATER TO AIR SET UP INSTALLATION 19 STOVE COMPONENTS 20 CONTROL PANEL 21 START UP OPERATION 22 OPERATION 23 WEEKLY MAINTENANCE 24 GENERAL MAINTENANCE 25 27 TROUBLE...

Страница 4: ......

Страница 5: ...series furnaces are often used to heat residential home garages shops barns businesses greenhouses swimming pools spas domestic hot water radiant in floor heat and snow melt applications Model RS7200E...

Страница 6: ...6...

Страница 7: ...ng to eliminate unnecessary smoke Never use gasoline lighter fluids chemicals or oils Furnace Sizing The size of a furnace should be large enough to provide sufficient heat without constant reloading...

Страница 8: ...tube com watch v jM2WGgRcnm0 EPA offers tips on how to properly use a moisture meter to test firewood before using in a wood burning stove or fireplace Wet wood can create excessive smoke which is was...

Страница 9: ...softwood or hardwood The pines spruces and firs are common softwoods and the oaks elms birches and maples are hardwoods Softwoods burn rapidly and are more resinous than the hardwoods therefore they w...

Страница 10: ...ading heat exchanger door or secondary combustion door open Do not store fuel or other combustible materials within marked installation clearances Inspect clean flues and chimney regularly CAUTIONS Ho...

Страница 11: ...prove the location relative to the distance from building and combustibles We recommend a minimum of 25 feet from any building Minimum Clearances to Combustibles Sides Front Back Top Chimney Connectio...

Страница 12: ...not be less than 24 inches wide 24 inches long 3 inches thick Obtain the footprint of the model of furnace you have purchased Place your blocks so that the legs will be in the center of them For a pa...

Страница 13: ...piping does not exceed a total of forty 40 ft When installing chimney please refer to manufacturer s recommendations and requirements for adequate clearances Furnaces come standard with the Selkirk br...

Страница 14: ...gravel or dirt At this point a water barrier is required Several methods are possible but the most important factor is if ground water comes in contact with your heating lines it will be the greatest...

Страница 15: ...furnace plenum If there is an air conditioning evaporator coil in the plenum install the water to air coil after the a c coil If the central heating system is a hot water boiler system a water to wat...

Страница 16: ...in the boiler to prevent damage from loss of circulation due to electrical power failure The Crown Royal Stove shall be installed without changing the function of the controls or rewiring the original...

Страница 17: ...m is too large or too small it must be altered to fit the heat exchanger properly After installation of the add on water to air exchanger the air flow must be increased to fuel the furnaces electric f...

Страница 18: ...intain the temperature in the hot water heater If installed on the hot side the hot water heater needs to be turned off and the hot water heater is now a reservoir If using 1 tubing open ball valve1 3...

Страница 19: ...Water Water to Air Exchanger Water to AirExchanger Boiler Drain Ball Valve Fitting WATER TO AIR SETUP INSTALLATION 19...

Страница 20: ...r Thermowell Solenoid To open and close combustion air opening Door Seals and High Temperature Silicone Fiberglass 1 Rope Nylon 5 rod and steel whip used to clean heat exchanger tubes Includes a drill...

Страница 21: ...button Wait 20 seconds to allow the smoke to evacuate from the furnace before opening firebox door For night filling the fan light switch can be in the light position while filling which will turn on...

Страница 22: ...ed The furnace will continue to feed an air supply to the fire until your aqua stat shut off temperature is reached 180F On this initial start up the water jacket will reach what is called the dew poi...

Страница 23: ...r is to be opened it should always be cracked slightly to allow oxygen to enter and burn off any combustion gases that are present before fully opening Failure to do this could result in sudden igniti...

Страница 24: ...eds to be removed before cleaning each exchanger tube Use the provided wire whip and pole and attach it to a drill to clean each heat exchanger Simply slide the wire whip and pole down each heat excha...

Страница 25: ...irebox secondary burn chamber and exchanger tubes Use a fire retardant closed container to empty ashes into Weekly Maintenance Perform weekly maintenance to heat exchanger tubes and secondary burn cha...

Страница 26: ...as act as an insulator causing incomplete gasification With an excessive ash buildup primary combustion air is restricted and the unit s output will be reduced Damages will result to unit if maintenan...

Страница 27: ...E To avoid a chimney fire ensure that daily weekly month and annual maintenance techniques are being followed If a fire is to occur close all doors including firebox and heat exchanger doors shut down...

Страница 28: ...doors is properly closed and the gasket is completely sealed 3 Check that the solenoid damper plate is opening and closing without hang ups 4 Check that the temperature settings and water levels are...

Страница 29: ...ELECTRICAL TROUBLESHOOTING 29...

Страница 30: ...ELECTRICAL DIAGRAM 30...

Страница 31: ...in sheltered area insufficient wind to disperse smoke C Furnace sizing Similar to other heating appliances furnace should be properly sized based on the estimated heat loss of the served structure II...

Страница 32: ...s properly b Combustion blower wheel spins properly c Blower runs at proper speed verify voltage to blower motor 2 Combustion blower tube not restricted by debris creosote ash etc 3 Flame baffle flue...

Страница 33: ...the wood either too high or too low will affect the amount of visible smoke Wood with a low moisture content less than 10 will burn relatively quicker resulting in some of the fuel going up the chimn...

Страница 34: ...it is loaded B Furnace Size The size of a furnace should be large enough to provide sufficient heat without constant reloading If the target burn time is 12 hours an adequately sized furnace will prov...

Страница 35: ...ed to the heat load so that cold starts and overfilling are avoided Chimney height should be in accordance with the state and local codes as well as surroundings including neighbors These areas along...

Страница 36: ...36...

Страница 37: ...ranty on Crown Royal Stoves it is required to use recommended treatment and submit annual samples for testing Failure to maintain treatment at recommended levels and annual water testing will result i...

Страница 38: ...eeks If testing results are unsatisfactory recommendations of additional treatment will be given These recommendations will need to be performed and a retest is required to maintain warranty o Low lev...

Страница 39: ...nually add of the required amount of treatment this will keep levels balanced Follow directions for collecting of water sample and mail to facility for testing annually Purchasing Water Treatment Wate...

Страница 40: ...induce vomiting If vomiting occurs give fluids again GET IMMEDIATE MEDICAL ATTENTION DO NOT GIVE ANYTHING BY MOUTH TO AN UNCONSCIOUS OR CONVULSING PERSON NOTE TO PHYSICIAN Introduction into the body m...

Страница 41: ...fuels or abuse Greentech Manufacturing Inc is not responsible for the cost of plumbing replacement of antifreeze shipping labor or any other cost other than the replacement of the part or furnace Gree...

Страница 42: ...ng Inc to qualify for warranty Greentech Manufacturing Inc always has the right to decide if the stove will be repaired or replaced To validate this warranty registration must be completed within 30 d...

Страница 43: ...welder to give an estimate to repair the stove which we approve and tell you the percentage covered This warranty is prorated so it will be covered by a percentage After you pay the bill you submit a...

Страница 44: ..._______________________________________________________________ __________________________________________________________________________________________ Repair Required _____________________________...

Страница 45: ...plications which range from refrigeration to heating due to the wide temperature range of the control stated above Typical applications include walk in freezers beverage coolers supermarket display ca...

Страница 46: ...REFER TO PAGE 6 STATUS INDICATOR LED LIT WHEN CONTROLLED LOAD IS ENERGIZED ON SEE NOTE TEMPERATURE UP BUTTON TEMPERATURE DOWN BUTTON MENU BUTTON PRESS TO ENTER MENU MODE REFER TO PAGES 4 5 SW1 Refrige...

Страница 47: ...tional connection to customer alarm equipment Binary Input Gold Plated Contacts 24 VAC Block not used TH Thermostat Hot TR Thermostat Return NTC Temperature Sensor PTC Temperature Sensor Fig 3 Line Vo...

Страница 48: ...ow the set point temperature will operate the load terminal CI indicates the setpoint temperature will be the Cut In temperature CO indicates the temperature will be the Cut Out temperature See Operat...

Страница 49: ...et Point SP Cut In Differential 5 Setpoint temperature 40 Temperature Range 40 Setpoint Cut Out 45 SW1 Cool Set Point SP Cut Out Differential 5 Setpoint temperature 40 Temperature Range HEAT To use as...

Страница 50: ...hould be given to these events to prevent a false alarm If the control set back feature is used to change the setpoint the delay period set in AL should consider the time it takes for the system to re...

Страница 51: ...sistance K 140 60 2 49 149 65 2 09 158 70 1 76 167 75 1 48 176 80 1 26 185 85 1 07 194 90 0 92 203 95 0 79 212 100 0 68 221 105 0 59 Temperature F C Resistance K 40 40 613 31 35 640 22 30 668 13 25 69...

Страница 52: ...ine 1 888 725 9797 www white rodgers com www emerson com White Rodgers is a division of Emerson Electric Co The Emerson logo is a trademark and service mark of Emerson Electric Co TROUBLESHOOTING Temp...

Страница 53: ......

Отзывы: