Please take the following steps before starting the unit for the first time:
•
Check sensing connections (shown in Table 8) from the power board to the controller
board
Table 8: Sensing connections from Power Board to the Control Board
•
Put PWM ON/OFF switch (sw2) in OFF position.
•
Put mode switch (sw1) in DC/AC position (i.e. 1).
•
For all digital logic supply inputs, the white wire is positive (+) and the blue wire is
negative (-)
•
Connect +7V supply to connector J7 (positive (+) to pin 1 and negative (-) to pin 2).
Check that the current drawn is approximately equal to the values specified under
“Current 1” in
Table 5.
•
Check for +3.3V (across CT2), +1.2V (across CT1), and +5V (across CT3) supplies on
control board.
•
Connect and switch ON both +15V and +15V_1 power supplies. Check the current
drawn from both 15V power supplies. The current drawn should be approximately
equal to the values specifi
ed under “Current 1” in
Table 5.
•
Put PWM ON/OFF switch (sw2) in ON position.
•
Check the following pulses on control board connectors (for purposes of the following
chart, Conn2 is marked as 2, Conn3 is marked as 3, Conn4 is marked as 4 and Conn5 is
marked as 5):