
CPWR-AN26, Rev A, 08-2018
Copyright © 2018 Cree, Inc. All rights reserved.
The information in this document is subject to change without notice.
Cree and Zero Recovery are registered trademarks, and the Cree logo and C3M are trademarks, of Cree, Inc
Figure 7. DC-AC Grid Connected Mode Test Set up
•
Connect AC source to AC terminals (output) of the evaluation board through MCB2. AC
source must be able to absorb the current fed from the converter.
•
Connect DC source to the evaluation board
’s
DC terminals (input) through MCB1.
•
Connect power analyzer to measure input and output power.
•
Use appropriately rated voltage and current probes and connect to the oscilloscope