background image

7

SECTION: D   START-UP OPERATION

D-1) Check Voltage and Phase: 

Before operating pump check to make sure that the 
voltage and phase information stamped on the pump’s 
identifi cation plate matches the available power.

D-2) Check Pump Rotation:

Before putting pump into service for the fi rst time, the 
motor rotation must be checked. Improper motor rotation 
can result in poor pump performance and can damage 
the motor and/or pump. To check the rotation, suspend 
the pump freely, momentarily apply power and observe 
the “kickback”.  “Kickback” should always be in a counter-
clockwise direction as viewed from the top of the pump 
(“kickback” is always opposite to impeller rotation). “Rota-
tion” and “kickback” direction is noted on the pump motor 
housing.

D-2.1) Incorrect Rotation for Single-Phase:

 

In the unlikely event that the rotation is incorrect for a 
single-phase pump, contact a Barnes Pumps Service 
Center.

D-3) Identifi cation Plate: 

Record the numbers off the pump’s identifi cation plate 
onto the START-UP REPORT provided at the end of the 
manual for future reference.

D-4) Start-Up Report:

Include at the end of this manual are two start-up report 
sheets. These sheets are to be completed as applicable. 
Return one copy to Barnes Pumps and store the second 
in the control panel or with the pump manual if no 
control panel is used. It is important to record this data at 
initial start-up since it will be useful to compare to when 
servicing the pump in the future.

Insulation Test:

Before the pump is put into service, an insulation (megger) 
test should be performed on it. The ohm values as well 
as the volts and amps should be recorded on the start-up 
sheet and stored safely in the control panel or with the 
pump manual if no control panel is used.

Pump-Down Test:

After the pump has been properly wired and lowered into 
the basin, sump, or lift station, it is advisable to check 
the system by fi lling with liquid and allowing the pump 
to operate through it’s pumping cycle. The time needed 
to empty the system, or pump-down time, should be 
recorded on the start-up sheet.

SECTION E: PREVENTATIVE MAINTENANCE

As the motor is oil fi lled, no lubrication or other 
maintenance is required, and generally Barnes pumps will 
give very reliable service and can be expected to operate 
for years on normal sewage pumping without failure. 
However, as with any mechanical piece of equipment a 
preventive maintenance program is recommended and 
suggested to include the following checks:

1)  Inspect motor chamber for oil level and contamination
 

and repair as required per section F-1.

2)  Inspect impeller and body for excessive build-up or
 

clogging and repair as required per section F-2.

3)  Inspect bearing and replace as required per section F-3.
4)  Inspect seal for wear or leakage and repair as required
 

per section F-4.

 

SECTION F: SERVICE AND REPAIR

 

NOTE: All item numbers ( ) refer to Figure 10.

WARNING ! - Electrical power to the pump 
motor must be disconnected and locked out 
to prevent any dangerous electrical hazards or 
personnel danger before any service work is 
done to the pump

.

CAUTION: - Operating pump builds up heat 
and pressure; Allow time for pump to cool 
to room temperature before handling or 
servicing

.

F-1) Lubrication: 

Anytime the pump is removed from operation and at least 
every twelve (12) months, the cooling oil in the motor 
housing (12) must be checked visually for oil level and 
contamination.

F-1.1) Checking Oil:

To check oil, set unit upright. Remove pipe plug (22). With 
a fl ashlight, visually inspect the oil in the motor housing 
(12) to make sure it is clean, clear and that the oil level is 
above all internal componentry. If oil appears satisfactory, 
replace pipe plug. If oil is low or appears contaminated, 
test oil as per section F-1.2

MODEL NO

HP

VOLT/

PH

Hz

RPM

(Nom)

NEMA

START

CODE

FULL

LOAD

AMPS

LOCKED

ROTOR

AMPS

CORD

SIZE

CORD

TYPE

CORD

O.D

inch (mm)

WINDING

RESISTANCE

MAIN - START

SE411HT

0.4

115/1

60

1750

A

8.0

26.0

14/3

SOOW

0.560 (14.2)

1.37 - 15.2

Winding Resistance ± 5%.  Pump rated for operation at ± 10% voltage at motor.

Содержание Barnes SE411HT

Страница 1: ...stant product improvement program product changes may occur As such Crane Pumps Systems reserves the right to change product without prior written notification 420 Third Street 83 West Drive Bramton Piqua Ohio 45356 Ontario Canada L6T 2J6 Phone 937 778 8947 Phone 905 457 6223 Fax 937 773 7157 Fax 905 457 2650 www cranepumps com Form No 107027A Rev D Series SE411HT 4Hp 1750 RPM 60 Hz Manual Index ...

Страница 2: ...NS 3 A PUMP SPECIFICATIONS 4 B GENERAL INFORMATION 5 C INSTALLATION INSTRUCTIONS 5 6 D START UP OPERATION 7 E PREVENTATIVE MAINTENANCE 7 F SERVICE AND REPAIR 7 10 G REPLACEMENT PARTS 10 TROUBLE SHOOTING 11 CROSS SECTION Fig 10 12 PARTS LIST 13 RETURN GOODS POLICY 15 WARRANTY START UP REPORT WARRANTY REGISTRATION SPECIAL TOOLS and EQUIPMENT INSULATION TESTER MEGGER DIELECTRIC TESTER SEAL TOOL KIT s...

Страница 3: ...ings DO NOT insert fingers in pump with power connected Always wear eye protection when working on pumps Make sure lifting handles are securely fastened each time before lifting DO NOT operate pump without safety devices in place Always replace safety devices that have been removed during service or repair Secure the pump in its operating position so it can not tip over fall or slide DO NOT exceed...

Страница 4: ...nless Steel PAINT Air Dry Enamel SEAL Design Single Mechanical Reservoir Secondary Exclusion Seal Material Carbon Ceramic Buna N Hardware 300 Series Stainless CORD ENTRY 15 ft 5m Cord with plug On 115 volt and Stainless Wire Mesh Strain Relief Pressure Gromment for sealing and strain relief SPEED 1750 RPM nominal UPPER BEARING Single Row Ball Oil Lubricated LOWER BEARING Single Row Ball Oil Lubric...

Страница 5: ...nes representative or Crane Pumps Systems Inc Service Department in Piqua Ohio telephone 937 778 8947 or Crane Pumps Systems Canada Inc Bramton Ontario 905 457 6223 SECTION C INSTALLATION C 1 Location These pumping units are self contained and are recommended for use in a sump or basin The sump or basin shall be vented in accordance with local plumbing codes This pump is designed to pump effluent ...

Страница 6: ...t be modified in any way except for shortening to a specific application Any splice between the pump and the control panel must be made in accordance with the electric codes It is recommended that a junction box if used be mounted outside the sump or be of at least NEMA 4 EEMAC 4 construction if located within the wet well Do not use the power cable to lift pump NOTE THE WHITE WIRE IS NOT A NEUTRA...

Страница 7: ...nd allowing the pump to operate through it s pumping cycle The time needed to empty the system or pump down time should be recorded on the start up sheet SECTION E PREVENTATIVE MAINTENANCE As the motor is oil filled no lubrication or other maintenance is required and generally Barnes pumps will give very reliable service and can be expected to operate for years on normal sewage pumping without fai...

Страница 8: ...on around the sealed areas and inspect joints for air bubbles If after five minutes the pressure is still holding constant and no bubbles are observed slowly bleed the pressure and remove the gauge assembly Replace the pipe plug using a sealant If the pressure does not hold then the leak must be located CAUTION Pressure builds up extremely fast increase pressure by TAPPING air nozzle Too much pres...

Страница 9: ...ate 2 and tighten motor screws Install o ring 11 onto seal plate 2 Slide the gland nut friction rings and grommet onto cord set see Figure 5 and slip cord through motor housing 12 Connect motor wires per Figure 6 Place motor housing 12 squarely onto seal plate while pulling excess cord through hole Tighten socket head screws 13 into motor housing Slide the friction rings 8b grommet 8c and gland nu...

Страница 10: ... serial number and date code Paragraph G 4 2 Pump model number Paragraph G 3 3 Pump part number Paragraph G 2 4 Part description 5 Item part number 6 Quantity required 7 Shipping instructions 8 Billing Instructions G 2 PART NUMBER The part number consists of a six 6 digit number which appears in the catalog A one or two letter suffix may follow this number to designate the design configuration Thi...

Страница 11: ...eller for freedom of operation security and condition Clean impeller and inlet of any obstruction 9 Loosen union slightly to allow trapped air to escape Verify that turn off level of switch is set so that the suction is always flooded Clean vent hole 10 Check rotation If power supply is three phase reverse any two of three power supply leads to ensure proper impeller rotation 11 Repair fixtures as...

Страница 12: ...12 FIGURE 10 ...

Страница 13: ... 2 051449 Friction Ring 8c 1 051451 Grommet 8d 1 108335A Wire Mesh Cord Grip 304 Stainless 8e 1 108336 Hex Nut 1 2 Stainless 10 1 016660 Self Tapping Screw 8 32 x 3 8 lg Stainless 11 1 019289 O Ring 12 1 093065A Motor Housing 13 2 084948 Socket Hd Cap Screw 1 4 20 x 1 25 Stainless 14 1 068053 Exclusion Seal 15 1 112561TE Impeller Cast Iron 16 1 099295 Ground Wire 17 1 068984 Gasket 18 1 089120A Vo...

Страница 14: ...formance specifications must be in writing and such writing must be signed by our authorized representative Due to inaccuracies in field testing if a conflict arises between the results of field testing conducted by or for user and laboratory tests corrected for field performance the latter shall control RECOMMENDATIONS FOR SPECIAL APPLICATIONS OR THOSE RESULTING FROM SYSTEMS ANALYSES AND EVALUATI...

Страница 15: ...nt To Insure That Employees Will Not Be Exposed To Health Hazards In Handling Said Material All Applicable Laws And Regulations Shall Apply IMPORTANT WARRANTY REGISTRATION Your product is covered by the enclosed Warranty To complete the Warranty Registration Form go to http www cranepumps com ProductRegistration If you have a claim under the provision of the warranty contact your local Crane Pumps...

Страница 16: ...Notes ...

Отзывы: