Snack / Refreshment Center Setup and Operator's Guide
Page 30
April, 1999
1670001
PREPARING THE MERCHANDISER FOR VENDING "TOP SHELF":
National Vendors recommends that this product be vended from a candy tray.
Move the tray so the package can be loaded standing on its left or right edge. See
MOVING A TRAY UP OR DOWN
.
The following steps must be completed for three adjacent positions on the tray:
NOTE
The left-most position in the group of three must be an
even numbered position.
09887@D)(9;634<)'=)>#9:).A7E=>-
Couple the left motor to the right motor. See the
Programming Guide.
Load the "Top Shelf" products as shown.
1. REMOVE COLUMN
DIVIDERS
2. REMOVE
SPIRALS
3. LEAVE THIS MOTOR
CONNECTOR ALONE
4. DISCONNECT THIS
MOTOR CONNECTOR
5. MOVE CONNECTOR FROM THIS MOTOR
TO THIS MOTOR
6. INSTALL AN 11-COUNT LEFT HAND
SPIRAL IN THIS POSITION
INSTALL AN 11-COUNT RIGHT-HAND
SPIRAL IN THIS POSITION
7.
TOP SHELF
PRODUCT
QB& & K"18*,D& 1& =%1F& N*-4& !%"8)2-& :2",-*,)$8;
Содержание 787E
Страница 2: ......