- 46 -
COMMISSIONING
2 - FILLING THE INSTALLATION WITH WATER
- The installation will have to be rinsed before the
boiler is filled with water. Installation decantation
should be provided for.
- To ensure proper boiler bleeding during the
installation’s filling stage:
• Filling the DHW tank for the THI 10-50 C mo-
dels + DHW production system:
. Fill the tank with water by using the safety
control of the installation, taking care to
open a hot water tap,
. After filling, check that the tank access flap
is tightened correctly.
• Filling the installation :
. Open the heating flow/return isolation
valves,
. Open the cold water inlet valve,
. Fill the installation slowly (to make degas-
sing easier) by using the valve of the filling
system,
. check the leaktightness of the circuit,
. Bleed the entire installation, particularly the
radiators. Continue to fill the system until a
pressure of approximately 1.5 bar is rea-
ched,
. turn off the filling valve.
3 - PRESSURE SENSOR
The pressure sensor features a small window that
displays the pressure status of the system without
any mains supply.
4 - GAS SUPPLY
- Open the gas cock (2, fig. 36 and fig. 37 -
page 35 - Chapter IV - INSTALLATION).
- Carefully bleed the gas piping. If the installation is
new, the bleed evacuates the air that is contained
in the piping so that the boiler has an adequate
fuel.
The presence of air in the gas prevents the igni-
tion of the burner and leads to safety shut-down
by the flame monitoring unit.
This is the case both with a natural gas and a
new
PG
installation. With a
PG
installation the
storage tank must also be bled properly before
commissioning.
The external discharge of the gas
bleed must be carried out with all ne-
cessary safety measures.
- Check the tightness of the connectors and the air-
tightness of the gas circuit using a foaming pro-
duct or a water column pressure gauge.
AST
-4
5-0
Fig. 42
Pressure too low = yellow
Pressure correct = green
Pressure too high = red
Colours Pressure ranges
Yellow
0 to 0,5 bar
Green
0,5 to 2,5 bar
Red
2,5 to 3,6 bar
!
Содержание THI 10-50c
Страница 61: ... 64 XII NOMENCLATURE THRi 10 50 C ...
Страница 64: ... 67 NOMENCLATURE CONTROL BOX ...
Страница 66: ... 69 NOTES ...