9
output wires, 1 for neutral
wire (optional)
RJ45 connecters
4
for communication cables
Red wire
1
for inverter with 1 MPPT
working alone
3.1 Basic requirements
Check that the product environmental specifications (protection degree,
operating temperature range, humidity and altitude, etc) meet the
requirements of the specific project location;
Make sure that the power grid voltage is within normal range;
Ensure that the local electricity supply authority has granted permission
to connect to the grid;
Installation personnel must be qualified electricians or people who have
received professional training;
Sufficient space is provided to allow the inverter cooling system to
operate normally;
Install the inverter away from flammable and explosive substances;
Avoid installing the inverter in locations that exceed the temperature
limits specified in the inverter data sheet to limit undesirable power loss;
Do not install the inverter near the electromagnetic source which can
compromise the normal operation of electronic equipment;
Содержание SC Series
Страница 1: ...CPS SC Series Grid tied PV Inverter CPS SC20KTL DO US 480 Installation and Operation Manual Ver 1 2 ...
Страница 17: ...15 Figure 3 7a Mounting inverter on the bracket Figure 3 7b Mounting inverter on the bracket Hand Grab ...
Страница 18: ...16 Figure 3 7c Mounting inverter on the bracket Figure 3 7d Mounting inverter on the bracket ...
Страница 30: ...28 Figure 3 21 Diagram of communication wiring ...
Страница 61: ...59 Figure 6 13 Securing panels on both sides ...