Operational Verification Checklist
B-2
Puritan Bennett 540™ Ventilator User’s Manual
10
Verify that the preventive maintenance schedule for the ventilator is
followed.
Pass
11
Ensure the patient breathing circuit is correctly attached to the
ventilator, with all the necessary components, and is free from any signs
of damage and leaks. If exhaled volume monitoring is required, use the
double-limb circuit for exhaled tidal volume or minute volume
monitoring.
Pass
Table B-1.
Operational Verification Checklist (Continued)
Содержание Puritan Bennett 540
Страница 1: ...Puritan Bennett 540 Ventilator User s Manual...
Страница 6: ...This page intentionally blank...
Страница 8: ...This page intentionally blank...
Страница 10: ...This page intentionally blank...
Страница 80: ...Installation and Assembly 4 20 Puritan Bennett 540 Ventilator User s Manual This page intentionally blank...
Страница 86: ...Operating Procedures 5 6 Puritan Bennett 540 Ventilator User s Manual This page intentionally blank...
Страница 94: ...This page intentionally blank...
Страница 100: ...Routine Maintenance 8 4 Puritan Bennett 540 Ventilator User s Manual This page intentionally blank...
Страница 118: ...Specifications A 18 Puritan Bennett 540 Ventilator User s Manual This page intentionally blank...
Страница 123: ...Puritan Bennett 540 Ventilator User s Manual C 3 Figure C 2 Dual Bag...
Страница 124: ...Unpacking and Preparation C 4 Puritan Bennett 540 Ventilator User s Manual This page intentionally blank...
Страница 134: ...Glossary F 6 Puritan Bennett 540 Ventilator User s Manual This page intentionally blank...
Страница 140: ......