11
15.1 Before operating the conveyor follow the instructions for Parking and Detaching the Trailer
(see Sections 9 & 10
– page 8).
15.2 Ensure the trailer chassis is level by winding up or down the jockey wheel and chock the wheels
if required.
15.3 Release the prop stand clamps and lower the two prop stands fully to the ground and retighten
the clamps.
15.4 Release the jockey wheel clamp and raise the jockey wheel up so the weight of the trailer is
now on the prop stands and securely tighten the jockey wheel clamp.
15.5 Take the
‘D’ Rings out of the two locking lynch pins
that secure the conveyor to the trailer chassis and
remove the pins.
15.6 Next ensure the hydraulic pump release tap is
tightened fully by turning it clockwise.
15.7 Using the hydraulic pump handle fully
raise the conveyor to its maximum discharge
height
15. CONVEYOR OPERATION