32
INSTALLATION
INSTALLATION MANUAL
11) Peel a small corner off the red plastic film on the
double-sided tape, fold this tape toward the
outside. (Do this step for both sides) (Figure 66)
12) Align and position the bottom of the wire guard
against the foot plate that lines up with the inner
shell hole. (Figure 68)
WARNING
The bottom of the wire guard must be properly
positioned on the foot plate. If not, review the
previous steps. An improper alignment or
positioning of the wire guard may cause the
system to misadjust itself.
13) Fit the wire guard on the corner of the post.
Ensure no wires are pinched and that the
wire guard is well levelled before adhering it
to the sleeve
. (Figure 69)
14) While still holding the wire guard on the post,
gently start peeling away the red film one side
at a time. This method will ensure proper
alignment. Hold for
at least one minute
to
ensure a proper bond. (Figure 69)
WARNING
A good amount of pressure is needed to ensure
that the wire guard band is properly on the sleeve.
Foot plate
Wire guard sits
on the foot plate
Figure 68
Figure 67
Figure 66
Peel off the red film at the
bottom of the wire guard.
Pull up on the red film to
stick the wire guard to the
sleeve.
Figure 69
Содержание OASIS
Страница 1: ...2019 Revision 0 2019 04 03 C A 232859 ...
Страница 44: ...44 TECHNICAL SPECIFICATIONS INSTALLATION MANUAL NOT TO SCALE Long side LS model Figure 87 ...
Страница 49: ...INSTALLATION MANUAL APPENDIX 49 APPENDIX ...
Страница 50: ...50 APPENDIX INSTALLATION MANUAL ...
Страница 51: ...INSTALLATION MANUAL APPENDIX 51 ...
Страница 52: ...52 APPENDIX INSTALLATION MANUAL ...
Страница 53: ...INSTALLATION MANUAL APPENDIX 53 ...
Страница 54: ...54 APPENDIX INSTALLATION MANUAL ...
Страница 55: ...INSTALLATION MANUAL APPENDIX 55 ...
Страница 56: ...56 APPENDIX INSTALLATION MANUAL ...
Страница 57: ...INSTALLATION MANUAL APPENDIX 57 ...
Страница 58: ...58 INSTALLATION MANUAL This page intentionally left blank see next page ...