background image

SCRN-530 Hardware Installation Guide | DOC-SCRN-530-HIG | 21 July, 2021 | Page 18

13. SCRN-530 LED Management

The LED display is active by default, but can be deactivated in light-sensitive 

environments as needed. Even when the display is disabled, the LED will be lighted 

during the following conditions: 

• while the radio node is booting
• if the radio node or cell is in fault state

Table 5

 lists the default LED behavior of the radio node.

4. TFTP

Flashing 

Blue

The radio node proceeds next 

to download the operating 

system image from the 

centralized unit. 
The radio node moves to the 

next state (State 5) after the 

image has been downloaded.

Failure to download TFTP 

image. 
Check firewall between radio 

node and centralized unit.

5. Operating 

System 

Booting

Solid Green 

for a few 

seconds, 

off for 

about 30 

seconds, 

then Solid 

Green

The radio node loads the 

operating system and starts 

the default platform 

applications. 
The radio node moves to the 

next state (State 6) when it 

establishes connectivity with 

the centralized unit.

Failure to start the operating 

system. 
This normally points to a 

software/build issue. Please 

contact Corning support.

6. Running

Solid Green The operating system is 

running. The radio node 

continues the startup 

sequence, but is now 

controlled by the centralized 

unit.

The operating system is up 

and running on the radio 

node. 
Any subsequent state 

transitions can now be 

tracked from events and logs 

on the centralized unit.

Table 4  SCRN-530 LED Boot Sequence (continued)

State

LED Color

Description

Possible Failures and 

Actions

Содержание SCRN-530

Страница 1: ...1 Small Cell Radio Node SCRN 530 Hardware Installation Guide DOC SCRN 530 HIG Issue 1 Related Literature Search www Corning com opcomm Click Required Resources Table 1 Revision History Issue Date Summ...

Страница 2: ...Micro USB Port 8 5 4 Status LED 8 Section 6 System Specifications 9 Section 7 Compliance 10 Section 8 Mounting the SCRN 530 11 8 1 Installing the SCRN 530 on a Ceiling 11 8 2 Installing the SCRN 530 o...

Страница 3: ...A digital device pursuant to part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment...

Страница 4: ...nd internal components Ensure that the SCRN 530 and associated antenna equipment is installed and serviced according to national and local ESD standards CAUTION Do not open the SCRN 530 casing E RAN w...

Страница 5: ...aration powering and experience in hardware installation and maintenance 2 Product Overview The SCRN 530 is a 5G mmWave Time Division Duplexing TDD radio node that supports 2 x 2 MIMO small cell opera...

Страница 6: ...dio Node Model Table 1 includes the SCRN 530 model configuration Table 1 Radio Node Configuration Radio Node Model Description Antenna Type SCRN 530 39 39 GHz band n260 mmWave RN with 8 x 8 dual polar...

Страница 7: ...30 Hardware Installation Guide DOC SCRN 530 HIG 21 July 2021 Page 7 4 SCRN 530 Views Figure 2 and Figure 3 display views of the SCRN 530 Figure 2 SCRN 530 Cover Figure 3 SCRN 530 With Ceiling Mount Br...

Страница 8: ...work interface module The hot pluggable SFP supplied with this SCRN 530 must be installed in the Transceiver Port The LC connector terminated end of the fiber pair of an ActiFi cable or other approved...

Страница 9: ...pport per UE Dimensions 279 4 x 279 4 x 80 3 mm 11 0 x 11 0 x 3 16 in Weight 4 5 kg 9 9 lbs Input Power 1 x 48 VDC Phoenix deliverable using Corning ActiFi 2 fiber 2 copper conductor composite cable P...

Страница 10: ...ed Unit X 509 certificate based authentication Environmental Requirements Operating temperature range 0 to 45 C 32 to 113 F Non operating temperature range 40 to 70 C 40 to 158 F Relative humidity Ope...

Страница 11: ...izes RF leakage outside the building When mounting near a wall or other obstruction orient the mounting bracket so that the top of the radio node faces towards the coverage area and faces away from th...

Страница 12: ...ted but if they do loosen them slightly to be able to slide the ceiling mount bracket on and off Step 3 Secure the ceiling tethering system Make sure that it can support the weight of the radio node a...

Страница 13: ...ing Mount Bracket 8 2 Installing the SCRN 530 on a Wall The SCRN 530 comes with the ceiling mount bracket attached and has the multi angle wall mount bracket loose in the box Figure 8 shows the radio...

Страница 14: ...rit level use the wall mount bracket as a template to mark securing hole locations Step 2 If required install sheet rock plugs Step 3 Attach the wall mount bracket to the wall Figure 8 shows the radio...

Страница 15: ...Cabling Guidelines Incorrectly cabling the SCRN 530 can result in crushed cables and loss of communications to the radio node Follow these guidelines when cabling the SCRN 530 Make sure that the cabl...

Страница 16: ...e brackets and cable connectors Step 4 Loosen the captive securing screw and slide out the bracket from the radio node 12 SCRN 530 LED Boot Sequence The radio node state machine is sequential and prog...

Страница 17: ...state should be very short lived and should transition to the next state immediately A radio node should not stay in this state indefinitely Note Flashing Green is also used to indicate a radio node t...

Страница 18: ...k firewall between radio node and centralized unit 5 Operating System Booting SolidGreen for a few seconds off for about 30 seconds then Solid Green The radio node loads the operating system and start...

Страница 19: ...ode Standard command to re enable the LED display set System RadioNode LED DefaultMode Standard Step 2 Issue the show System RadioNode LED command to verify the configuration show System RadioNode LED...

Страница 20: ...attended Corning Small Cell training in the past two years Email onesupport corning com to request a login if you meet these criteria Corning Optical Communications LLC 4200 Corning Place Charlotte NC...

Отзывы: