background image

SCRN-530 Hardware Installation Guide | DOC-SCRN-530-HIG | 21 July, 2021 | Page 20

16. SFP+ LED Indications

The enhanced small form-factor pluggable has a green Link Status Indicator LED, and 

an unused amber LED. The Link Status Indicator LED has the following operational 

modes:

• Off

No Link (disconnected)

• Solid Green

10 Gbps link has been established

17. Corning Documentation Set

The Corning documentation can be downloaded from the customer support portal 

(the “Corning One Community”) at https://onesupport.corning.com. This site 

requires a login which is available to individuals who have attended Corning Small 

Cell training in the past two years. Email [email protected] to request a login 

if you meet these criteria.

Corning Optical Communications LLC • 4200 Corning Place, Charlotte, NC 28216 USA

800-743-2675 • FAX: 828-325-5060 • International: +1-828-901-5000 • www.corning.com/opcomm

Corning Optical Communications reserves the right to improve, enhance, and modify the features and specifications of Corning Optical Communications products without 

prior notification. A complete listing of the trademarks of Corning Optical Communications is available at www.corning.com/opcomm/trademarks. All other trademarks 

are the properties of their respective owners. 

Corning Optical Communications is ISO 9001 certified. © 2021 Corning Optical Communications. All rights reserved.

Содержание SCRN-530

Страница 1: ...1 Small Cell Radio Node SCRN 530 Hardware Installation Guide DOC SCRN 530 HIG Issue 1 Related Literature Search www Corning com opcomm Click Required Resources Table 1 Revision History Issue Date Summ...

Страница 2: ...Micro USB Port 8 5 4 Status LED 8 Section 6 System Specifications 9 Section 7 Compliance 10 Section 8 Mounting the SCRN 530 11 8 1 Installing the SCRN 530 on a Ceiling 11 8 2 Installing the SCRN 530 o...

Страница 3: ...A digital device pursuant to part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment...

Страница 4: ...nd internal components Ensure that the SCRN 530 and associated antenna equipment is installed and serviced according to national and local ESD standards CAUTION Do not open the SCRN 530 casing E RAN w...

Страница 5: ...aration powering and experience in hardware installation and maintenance 2 Product Overview The SCRN 530 is a 5G mmWave Time Division Duplexing TDD radio node that supports 2 x 2 MIMO small cell opera...

Страница 6: ...dio Node Model Table 1 includes the SCRN 530 model configuration Table 1 Radio Node Configuration Radio Node Model Description Antenna Type SCRN 530 39 39 GHz band n260 mmWave RN with 8 x 8 dual polar...

Страница 7: ...30 Hardware Installation Guide DOC SCRN 530 HIG 21 July 2021 Page 7 4 SCRN 530 Views Figure 2 and Figure 3 display views of the SCRN 530 Figure 2 SCRN 530 Cover Figure 3 SCRN 530 With Ceiling Mount Br...

Страница 8: ...work interface module The hot pluggable SFP supplied with this SCRN 530 must be installed in the Transceiver Port The LC connector terminated end of the fiber pair of an ActiFi cable or other approved...

Страница 9: ...pport per UE Dimensions 279 4 x 279 4 x 80 3 mm 11 0 x 11 0 x 3 16 in Weight 4 5 kg 9 9 lbs Input Power 1 x 48 VDC Phoenix deliverable using Corning ActiFi 2 fiber 2 copper conductor composite cable P...

Страница 10: ...ed Unit X 509 certificate based authentication Environmental Requirements Operating temperature range 0 to 45 C 32 to 113 F Non operating temperature range 40 to 70 C 40 to 158 F Relative humidity Ope...

Страница 11: ...izes RF leakage outside the building When mounting near a wall or other obstruction orient the mounting bracket so that the top of the radio node faces towards the coverage area and faces away from th...

Страница 12: ...ted but if they do loosen them slightly to be able to slide the ceiling mount bracket on and off Step 3 Secure the ceiling tethering system Make sure that it can support the weight of the radio node a...

Страница 13: ...ing Mount Bracket 8 2 Installing the SCRN 530 on a Wall The SCRN 530 comes with the ceiling mount bracket attached and has the multi angle wall mount bracket loose in the box Figure 8 shows the radio...

Страница 14: ...rit level use the wall mount bracket as a template to mark securing hole locations Step 2 If required install sheet rock plugs Step 3 Attach the wall mount bracket to the wall Figure 8 shows the radio...

Страница 15: ...Cabling Guidelines Incorrectly cabling the SCRN 530 can result in crushed cables and loss of communications to the radio node Follow these guidelines when cabling the SCRN 530 Make sure that the cabl...

Страница 16: ...e brackets and cable connectors Step 4 Loosen the captive securing screw and slide out the bracket from the radio node 12 SCRN 530 LED Boot Sequence The radio node state machine is sequential and prog...

Страница 17: ...state should be very short lived and should transition to the next state immediately A radio node should not stay in this state indefinitely Note Flashing Green is also used to indicate a radio node t...

Страница 18: ...k firewall between radio node and centralized unit 5 Operating System Booting SolidGreen for a few seconds off for about 30 seconds then Solid Green The radio node loads the operating system and start...

Страница 19: ...ode Standard command to re enable the LED display set System RadioNode LED DefaultMode Standard Step 2 Issue the show System RadioNode LED command to verify the configuration show System RadioNode LED...

Страница 20: ...attended Corning Small Cell training in the past two years Email onesupport corning com to request a login if you meet these criteria Corning Optical Communications LLC 4200 Corning Place Charlotte NC...

Отзывы: