IDC Pro 255 Installation Manual
© 2016-2018, Cornelius Inc.
- 19 -
Publication Number: 621058578INS
Purging The Syrup Lines
The purge process is performed as part of the “Syrup Line Cleaning & Sanitizing” section on page 21. It is also used
to ensure no air is in the lines before Brixing. If a BIB container is replaced, the syrup lines need to be purged and
sanitized. To purge the lines, perform the procedure in Table 10.
7
The Brand Selection screen opens and you can
select the brand to be mapped to the valve loca-
tion.
8
Repeat Steps 4 & 5 for each location desired.
9
When all the flavors on the LH are mapped, press the right button and repeat steps 4 & 5 for the RH side. If the
setup will be identical on the LH and RH side, press the copy to other side button and confirm when prompted.
10
When all the flavors are mapped as desired, press the Save button to save the settings.
Table 10.
Step
Action
1
Ensure that the water and CO
2
are turned on. (initial setup only)
2
Display the keypad screen by tapping each cor-
ner of the video screen starting in the upper right
corner and continuing to tap each corner in a
counterclockwise direction, in the form of a “C”.
NOTE: As each corner is touched, a
small confirmation rectangle
momentarily appears to confirm
the touch.
Table 9.
Step
Action
Содержание IDC PRO 255
Страница 8: ...IDC Pro 255 Installation Manual 2016 2018 Cornelius Inc 5 Publication Number 621058578INS Figure 1 ...
Страница 42: ......
Страница 43: ...Cornelius Inc www cornelius usa com ...