background image

Installation Manual
“I” Series 224
Ice Cube Machine

IMPORTANT:

TO THE INSTALLER.
It is the responsibility of
the Installer to ensure that
the water supply to the
dispensing equipment is
provided with protection
against backflow by an air
gap as defined in
ANSI/ASME A112.1.2-1979;
or an approved vacuum
breaker or other such
method as proved effective
by test.

Water pipe connections
and fixtures directly
connected to a potable
water supply shall be
sized, installed, and
maintained according to
Federal, State, and Local
Codes.

PRINTED IN U.S.A

IMI CORNELIUS INC; 1998–2003

IMI CORNELIUS INC  

g

  One Cornelius Place   

g

  ANOKA, MN 55303–6234

Telephone (800) 238–3600                                      Facsimile (800) 535–4231

Part No. 630460070 
June 13, 1998
Revised October 9, 2003
Revision B
Control Code A

THIS DOCUMENT CONTAINS IMPORTANT INFORMATION
This Manual must be read and understood before installing or operating this equipment

Содержание IACS224

Страница 1: ...ctive by test Water pipe connections and fixtures directly connected to a potable water supply shall be sized installed and maintained according to Federal State and Local Codes PRINTED IN U S A IMI C...

Страница 2: ...5 ELECTRICAL 7 INSTALLATION CHECK POINTS 7 START UP AND CHECK OUT 8 OWNER OPERATOR 9 CLEANING PROCEDURES 9 PREP CLEANING 9 CLEANING THE WATER SYSTEM AND EVAPORATOR 9 SANITIZING PROCEDURES 10 DUMP CYCL...

Страница 3: ...Do not let anyone operate the machine without instructions Keep your machine in proper working condition Unauthorized modifications to the machine may impair function and or safety and affect the mac...

Страница 4: ...2 630460070 THIS PAGE LEFT BLANK INTENTIONALLY...

Страница 5: ...cartons for visible damage Open and inspect as required before the driver leaves and have him or her note any damage on the receipts All damaged claims must be inspected within 15 days of delivery Not...

Страница 6: ...CULATION FAN MOTOR Water Cooled and Remote Systems only Volts 115 220 115 220 Phase 1 1 1 1 Hertz 60 50 60 50 Amps Running 1 4 1 4 36 17 Watts 35 35 6 5 WATER PUMP Volts 115 220 115 220 Phase 1 1 1 1...

Страница 7: ...ct ever be exposed to freezing temperatures it must be shut down and winterized FIGURE 1 INSTALLATION AIR COOLED WATER COOLED SHUT OFF VALVE WATER FILTER BIN DRAIN TUBE ELECTRICAL CORD TO OUTLET DUMP...

Страница 8: ...6 630460070 FIGURE 2 CUBER INSTALLATION...

Страница 9: ...ls is affected causing pressure variations These pressure variations can result in low or a failed ice harvest 1 Has bin and cuber been leveled and sanitized 2 Does electrical and plumbing meet code r...

Страница 10: ...evaporator cools to 25_F 3 9_ C Depress the manual harvest switch located on the circuit board The fan motor will stop and the water dump valve will open in 3 seconds the hot gas solenoid will open a...

Страница 11: ...e in the storage bin or dispenser must be removed WARNING When using any chemical rubber gloves and eye protection should be worn PREP CLEANING Use full strength ice machine cleaner on a coarse surfac...

Страница 12: ...ion common liquid laundry bleach to the water pan and allow the pump to circulate the solution for 5 minutes You may also use a commercial sanitizer such as Calgon Ice Machine Sanitizer following the...

Страница 13: ...itch the pump will stop and the float will return the water level back to its original setting and shut off the wa ter supply 3 You have the option of selecting dump cycle intervals of S every cycle S...

Страница 14: ...F Dump Every Third Harvest 3 OFF ON Dump Every Seventh Harvest S3 2 S3 2 S3 2 Condenser Sensor Harvest Voltage Set point pins 2 and 3 Factory setting 1 224 V GR GR GR GR Fan Dump Gear Gas Pump FIGURE...

Страница 15: ...vest cycle As the ice harvest bar swings closed the ice machine returns into the freezing cycle FULL BIN CONTROL A bin thermostat is provided to control the level of the ice in the storage bin When th...

Страница 16: ...er normal operating conditions Models IACS50 AC322 and WC322 are excluded from this warranty clause LIMITED LABOR WARRANTY PERIOD In addition to the parts warranty CORNELIUS will pay scheduled straigh...

Страница 17: ...15 630460070 THIS PAGE LEFT BLANK INTENTIONALLY...

Страница 18: ...One Cornelius Place Anoka Minnesota 55303 6234 Telephone 800 238 3600 Facsimile 763 422 3246 Corporate Headquarters IMI CORNELIUS INC...

Отзывы: