
7
2
9
CHAPTER 9 - MAINTENANCE
Only trained personnel who knows how the lift works, must be allowed to service
the lift
.
To service properly the lift, the following has to be carried out:
use only genuine spare parts as well as equipment suitable for the work required;
follow the scheduled maintenance and check periods shown in the manual;
discover the reason for possible failures such as too much noise, overheating, oil blow-by,
etc.
Refer to documents supplied by the dealer to carry out maintenance:
functional drawing of the electric and hydraulic equipment
exploded views with all data necessary for spare parts ordering
list of possible faults and relevant solutions.
Before carrying out any maintenance or repair on the lift, disconnect the power
supply, padlock the general switch and keep the key in a safe place to prevent
unauthorized persons from switching on or operating the lift
9.1
ORDINARY MAINTENANCE
The lift has to be properly cleaned at least once a month. Use self-cleaning clothes.
The use of water or inflammable liquid is strictly forbidden
Be sure the rod of the hydraulic cylinders is always clean and not damaged since this may result in
leakage from seals and, as a consequence, in possible malfunctions.
9.2
PERIODIC MAINTENANCE
Every 3 months
Hydraulic circuit
check oil tank level; refill with oil, if needed;
check the circuit for oil leakage.
Check seals for proper conditions and replace
them, if necessary;
Foundation bolts
check bolts for proper tightening
Hydraulic pump
verify that no noise changes take place in the pump
of the control desk when running and check fixing
bolts for proper tightening
Safety system
check safety devices for proper operation
Every 6 months
Oil
Check oil for contamination or ageing.
Contaminated oil is the main reason for failure of
valves and shorter life of gears pumps
Every 12 months
General check
verify that all components and mechanisms are not
damaged
Содержание ERCO 500
Страница 14: ...14 Figura 4 LAYOUT PSS MONOFORBICE ESTENSIONE...
Страница 15: ...15 Figura 4a LAYOUT PSS MONOFORBICE CON FLAP...
Страница 16: ...16 Figura 4b LAYOUT PSS MONOFORBICE ESTENSIONE CON OPERA CIVILE...
Страница 17: ...17 Figura 4c LAYOUT PSS MONOFORBICE CON FLAP CON OPERA CIVILE...
Страница 21: ...21 Figura 7 SCHEMA ELETTRICO...
Страница 29: ...29 Figura 16 COLLEGAMENTO TUBI IDRAULICI A B F...
Страница 51: ...51 Figura 4 LAYOUT PSS MONOFORBICE WITH ESTENSION...
Страница 52: ...52 Figura 4a LAYOUT PSS MONOFORBICE WITH FLAP...
Страница 53: ...53 Figura 4b LAYOUT PSS MONOFORBICE ESTENSION WITH FRAME...
Страница 54: ...54 Figura 4c LAYOUT PSS MONOFORBICE FLAP WITH FRAME...
Страница 58: ...58 Figure 7 ELECTRICAL DIAGRAM...
Страница 66: ...66 Figure 16 HIDRAULIC HOSE CONECTION A B F...
Страница 87: ...Figura 4 PLAN D ENSEMBLE F...
Страница 88: ...Figura 4a PLAN D ENSEMBLE F...
Страница 89: ...Figura 4b PLAN D ENSEMBLE F...
Страница 90: ...Figura 4c PLAN D ENSEMBLE F...
Страница 94: ...F Figura 7 SCHEMA ELECTRIQUE...
Страница 102: ...F Figure 16 RACCORDEMENT DES TUYAUX HYDRAULIQUES A B F...
Страница 124: ...124 Bild 4 LAYOUT...
Страница 125: ...125 Bild 4a LAYOUT...
Страница 126: ...126 Bild 4b LAYOUT...
Страница 127: ...127 Bild 4c LAYOUT...
Страница 131: ...131 Bild 7 ELEKTROSCHALTPLAN...
Страница 139: ...139 Bild 16 ANSCHLIESSEN DER HYDRAULIKLEITUNGEN A B F...
Страница 161: ...Figura 4a DISE O DESARROLLADO...
Страница 162: ...Figura 4b DISE O DESARROLLADO...
Страница 163: ...Figura 4c DISE O DESARROLLADO...
Страница 167: ...Figura 7 ESQUEMA EL CTRICO...
Страница 175: ...Figura 16 CONEXI N DE LOS TUBOS HIDR ULICOS A B F...